The  boiler  must  be  installed  in  a  fixed  loca-

tion  and  only  by  specialized  and  qualified

firms  in  compliance  with  all  instructions

contained in this manual. 

Furthermore,  the  installation  must  be  in

accordance  with  current  standards  and

regulations.

2.1

BOILER ROOM

The 

“PLANET DEWY  30  BFR”

version  boi-

lers  can  be  installed  in  any  domestic  envi-

ronment  without  any  location  restrictions

or comburent air requirements.

The following optional accessories are avail-

able to facilitate water and gas connection

of the boiler with the heating system: 

– fixing jig code 8081205

– codos kit code 8075418

– cock kit code 8091806

– system filling kit code 8094010

– kit for replacement of other brands’ wall-

mounted units code 8093900.

Detailed  instructions  for  assembly  of  the

unions are provided with the kits.

2.2

INSTALLATION OF MULTIPLE 

BOILERS IN MODULAR UNITS 

USING THE SUITABLE KIT 

Installation  of  modular  plants  consisting  of

three or four appliances for the same use in

the  same  room  or  in  adjoining  rooms  with  a

total input of over 70 kW, is considered part

of  a  single  plant,  meaning  that  the  size  and

characteristics of the boiler room must com-

ply with current safety regulations. 

The  distance  between  the  walls  of  the  room

and  the  external  points  of  the  boiler  (right,

left  and  rear  panels)  must  not  be  less  than

0.5  m.  To  ensure  adequate  airing  of  the

room,  ventilation  inlets  with  the  sur face

areas  laid  down  by  the  UNE  60-601  stan-

dard must be made in the external walls.

2.3

CONNECTING UP SYSTEM

Before proceeding to connect up the boi-

ler, you are recommended to make the air

circulating  in  the  piping  in  order  to  elimi-

nate  any  foreign  bodies  that  might  be

detrimental  to  the  operating  efficiency  of

the  appliance.  When  making  the  hydraulic

connections,  make  sure  that  the  dimen-

sions indicated in fig. 1 are respected. 

The  discharge  pipe  of  the  safety  valve

must  be  connected  to  a  collector  funnel

for  channelling  away  any  discharge  if  the

safety valve goes into action.

Gas  connections  must  comply  with  UNI

7129/92  and  UNI7131/99  standards.

When sizing gas piping, from the meter to

the boiler, take into account both the volu-

me flow rates (consumption) in m

3

/h and

the relative density of the gas in question.

The  sections  of  the  piping  making  up  the

system  must  be  such  as  to  guarantee  a

supply  of  gas  sufficient  to  cover  the  maxi-

mum  demand,  limiting  pressure  loss

between the gas meter and any apparatus

being used to not greater than 1.0 mbar for

family II gases (natural gas).

An adhesive data plate is sticked inside the

front panel; it contains all the technical data

identifying the boiler and the type of gas for

which the boiler is arranged.

2.3.1

Connection 

of condensation 

water trap

The drip board and its water trap must be

connected  to  a  civil  drain  through  a  pipe

with a slope of at least 5 mm per metre to

ensure drainage of condensation water. 

The  plastic  pipes  normally  used  for  civil

drains  are  the  only  type  of  pipe  which  is

appropriate  for  conveying  condensation

to the building’s sewer pipes.

2.3.2

Filter on the gas pipe

The gas valve is supplied ex factory with an

inlet  filter,  which,  however,  is  not  adequate

to entrap all the impurities in the gas or in

gas main pipes. 

To prevent malfunctioning of the valve, or in

certain  cases  even  to  cut  out  the  safety

device  with  which  the  valve  is  equipped,

install an adequate filter on the gas pipe.

2.4

CHARACTERISTICS OF 

FEEDWATER

To  prevent  lime  scale  and  damage  to  the

tap  water  exchanger,  the  water  supplied

should  have  a  hardness  of  no  more  than

20°F. In all cases the water used should be

tested  and  adequate  treatment  devices

should be installed. To prevent lime scale or

deposits  on  the  primary  exchanger,  the

water  used  to  supply  the  heating  circuit

should must be treated in accordance with

UNI-CTI 8065 standards.

It is absolutely essential that the water is to

be treated in the following cases:

– Very  extensive  system  (with  high  con-

tents of feedwater).

– Frequent  addition  of  makeup  water  into

the system.

– Should  it  be  necessary  to  empty  the

system either partially or totally.

2.5

SYSTEM FILLING

The charge pressure, with the system cold,

must be 

1 bar

Filling  must  be  done  slowly  so  as  to  allow

any air bubbles to be bled off through the air

valves.  A  system  filling  kit  may  be  supplied

on  request  containing  assembly  instruc-

tions.

2.6

COAXIAL DUCT ø 60/100

The  air  inlet-smoke  outlet  assembly,  code

8096200, is included in the standard sup-

ply of the appliance complete with mounting

instructions.

2.6.1

Coaxial duct 

accessories

The accessories to be used for this type of

installation  and  some  of  the  connecting

systems  that  may  be  adopted  are  illustred

in fig. 6. 

With the pipe bend included in the kit, the

maximum  length  of  the  piping  should  not

2

INSTALLATION

Fig. 6

KEY
1a-b Coaxial duct kit code 8096200
2

Extension L. 1000 code 8096100

3

Vertical extension L. 200 
with take-off point code 8086904

4

90° additional bend code 8095800

NOTE: The pipe should be sloped toward the interi-
or so that condensation will run off into the boiler. 

IMPORTANT:
– Each  additional  90° curve  installed  reduces  the

available length by 0.90 metres.

– Each  additional  45° curve  installed  reduces  the

available length by 0.45 metres.

Содержание PLANET DEWY 30 BFR

Страница 1: ...is unobstructed and has been pro perly installed Make sure that any shutoff valves are open Make sure that the system is charged with water and is thoroughly vented Check that the circulating pump is...

Страница 2: ...H return 3 4 M C H flow 3 4 G Gas connection 3 4 C1 System filling optional 1 2 S3 Condensation outlet 25 1 3 TECHNICAL FEATURES 30 BFR Heat output Nominal 80 60 C kW kcal h 28 3 24 300 Minimum 80 60...

Страница 3: ...ixing jig 19 90 C limit stat 20 Condensation water trap 21 Gas rate adjuster 22 System filling optional 23 Aqua Guard 24 Non return valve 1 5 MAIN COMPONENTS Fig 3 KEY 1 Control panel 2 Gas rate adjus...

Страница 4: ...e data plate is sticked inside the front panel it contains all the technical data identifying the boiler and the type of gas for which the boiler is arranged 2 3 1 Connection of condensation water tra...

Страница 5: ...ow eaves 300 D below balcony 1 300 E from adjacent window 400 F from adjacent ventilation opening 600 G from horizontal or vertical soil or drain pipes 2 300 H from corner of building 300 I from reces...

Страница 6: ...on calculation in that the sum of the head losses of the single fittings is less than 15 5 mm H2O Inlet Outlet 7 m horizontal pipe 80 x 0 20 1 40 7 m horizontal pipe 80 x 0 30 2 10 n 2 90 elbows 80 x...

Страница 7: ...eed 15 5 mm H2O When calculating the lengths of pipe take into account the parameters given in the Table 2 2 8 60 PIPING SYSTEM A special kit allows to separate smoke outlet and air intake pipes The 8...

Страница 8: ...cables of section 0 5 mm2 First of all assemble and wire the socket 2 then insert the equipment which will start up as soon as it receives current To gain access to connector 3 remove the control pan...

Страница 9: ...electrode ER Sensing electrode TS 100 C safety stat V Fan TPA Water pressure transducer P Pump SE External sensor optional TA Room stat SM C H sensor blue TR Transformer 230 24V FL Flowmeter CR Logic...

Страница 10: ...rough a window contact Anti bacterial 2 10 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point wit...

Страница 11: ...nute of the prescribed delivery temperature value sent in C is limited to the imposed value With the activation of the adaptation the pre set value transmitted to the boiler regulator is adapted to th...

Страница 12: ...o par metro 64 1 0 activa s a sonda interna 0 externa 100 interna 50 valor m dio da sonda externa interna 100 activa s a sonda externa Para a regula o ambiente e a visualiza o utilizada a mistura pro...

Страница 13: ...egulated so as to obtain a pressure of approx 3 mbar at the burner for methane gas and 7 mbar for propane gas G31 To increase pressure turn the trimmer clockwise to reduce pres sure turn the trimmer c...

Страница 14: ...up There could have a break in the wire of the sensing electrode or the electrode itself is touching earth the electrode is worn out and needs replacing The con trol box is defective When there is a...

Страница 15: ...function of the flow in graph in fig 21 3 7 MAINS ELECTRICITY CONNECTION Use a separate electricity supply to con nect the room stats and relative zone val ves or pumps The micro or relay contact con...

Страница 16: ...2 Gas valve 3 Mixer intake 4 Ventilator intake 5 Nozzle 6 Fan 7 Air gas mixer 8 Air pressure switch 9 Digital pressure gauge Fig 24 0 30 20 10 p aria mm H2O Potenza termica kW 25 20 10 15 50 40 60 5 3...

Страница 17: ...G31 boilers it is a good idea to check that the position of the GPL bridge on the control board is correct Diaphragm code 6028640 Drawing 7 is assembled on the Dewy 25 model functioning on PROPANE G3...

Страница 18: ...sliding them out of their slots 4 6 CLEANING AND MAINTENANCE Preventive maintenance and checking of efficient operation of equipment and safety devices must be carried out exclusively by authorized te...

Страница 19: ...ing of the water C H TEMPERATURE ADJUSTMENT fig 2 The C H temperature can be adjusted by turning the knob of the C H potentiometer The set temperature is indicated on the red led scale from 35 80 C an...

Страница 20: ...out occurs again call local authorised Service Centre for technical assistance Other anomalies fig 6 When one of the red 40 80 C leds start flashing switch off the boiler and then try to ignite again...

Страница 21: ...utton automatic operation 4 Operating mode button manual operation 5 Operating mode button availability 6 Cover with instruction compartment 7 Temperature knob 8 Presence button Fig 8 KEY 1 Display ti...

Страница 22: ...l lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperatu...

Страница 23: ...ity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seco...

Страница 24: ...rature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para...

Страница 25: ...of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 9 3 Display of the current boiler temperature Display of the current power of...

Страница 26: ...fficient water pressure Reset operation using the boiler charge valve fig 4 Plant overpressure Call an authorised Service Centre Safety thermostat trips Call an authorised Service Centre Fan air press...

Отзывы: