background image

94

3.3

ELECTRONIC

IGNITION

Ignition  and  flame  detection  is  controlled

by two electrodes located on the burner.

These  guarantee  maximum  safety  with

intervention  times,  for  accidental  swit-

ching  off  or  gas  failure,  of  within  one

second.

3.3.1

Operating cycle

Rotate the selector knob to summer or win-

ter, and verify that green led (

) lights up to

confirm the presence of voltage.

The  burner  must  be  ignited  within  10

seconds. However, it is possible for ignition

failures  to  occur,  with  consequent  activa-

tion of signal indicating that the control box

has “locked out”.

Gas failure

The electrode continues spark discharge

for  a  maximum  of  10  sec.If  the  burner

does  not  light,  the  lock-out  indicator  will

light up.

This  may  occur  upon  first  ignition  or

after  long  periods  of  boiler  lay-off  when

there is air in the pipes. It may be caused

by the gas cock being closed or by one of

the valve coils having a break in the win-

ding, so that the valve cannot open. 

Ignition electrode fails to spark

In the boiler, only the gas to the burner

is seen to open. 

After  10  sec.  the  warning  light  indica-

ting equipment “lock-out” lights up. 

This may be due to a break in the wire of

the electrode or to the wire not properly

fastened  to  the  electric  terminal  of  the

control box or the ignition transformer. 

No detection of flame

The  continuous  spark  discharge  of  the

electrode  is  noted  starting  from  ignition

even though the burner is lit. 

A f t e r   10  s e c o n d s   h a v e   e l a p s e d ,   t h e

sparks  cease,  the  burner  goes  out,  and

the  warning  light  indicating  equipment

“lock-out” lights up. 

There  could  have  a  break  in  the  wire  of

the  sensing  electrode  or  the  electrode

itself  is  touching  earth:  the  electrode  is

worn  out  and  needs  replacing.  The  con-

trol box is defective.

When there is a sudden voltage failure, the

burner shuts out immediately; when power

supply returns, the boiler will start up again

automatically.

3.4

AIR PRESSURE

SWITCH

The  air  pressure  switch  is  factory  set  to

the  values  40-57  Pa  to  guarantee  boiler

functioning even with intake and flue pipes

at the maximum permitted length. 

The  value  of  the  signal  to  the  pressure

switch is measured using a special instru-

ment  connected  to  the  pressure  intake

(5-4 fig. 3).

3.5

FLOW SWITCH SAFETY VALVE

A flow switch safety valve (18 fig. 3) interve-

nes, blocking the operation of the burner if

the  boiler  is  without  water  due  to  the  for-

mation of an air lock in the heat exchanger

or if the circulator is not working, or becau-

se the “Aqua Guard” filter is obstructed with

impurities.

NOTE: If replacing the flow switch valve,

make  sure  that  the  arrow  stamped  on

the valve points in the same direction as

the flow of water.

Fig. 20

1

2

3

4

5

12

11

10

9

8

7

6

15

6

10

KEY

1 Ignition electrode earth faston
2 Ignition electrode faston
3 Fuse (1,6 AT)
4 Fuse(0,16 AT)
5 “ANN. RIT.” connector
6 “POT. ACC.” trimmer
7 Conector “MET-GPL”
8 ------

9 Detector electrode faston

10 “POT. RISC.” trimmer

11 C.H. potentiometer
12 Selector CR/OFF/EST/INV/RESET
15 Albatros RVA 47 conector

NOTE:
To gain access to trimmers (6) and (10), unscrew
the central heating potentiometer knob.

TABLE 3/a (Transducer)

Pressure

Resistance (

)

(bar)

min

max

0

297

320

0,5

260

269

1

222

228

1,5

195

200

2

167

173

2,5

137

143

3

108

113

3,5

90

94

WARNING:  In  sequence/cascade
installations, turn trimmer B (10) as
far as it will go clockwise.

Содержание PLANET DEWY 30 BFR

Страница 1: ...is unobstructed and has been pro perly installed Make sure that any shutoff valves are open Make sure that the system is charged with water and is thoroughly vented Check that the circulating pump is...

Страница 2: ...H return 3 4 M C H flow 3 4 G Gas connection 3 4 C1 System filling optional 1 2 S3 Condensation outlet 25 1 3 TECHNICAL FEATURES 30 BFR Heat output Nominal 80 60 C kW kcal h 28 3 24 300 Minimum 80 60...

Страница 3: ...ixing jig 19 90 C limit stat 20 Condensation water trap 21 Gas rate adjuster 22 System filling optional 23 Aqua Guard 24 Non return valve 1 5 MAIN COMPONENTS Fig 3 KEY 1 Control panel 2 Gas rate adjus...

Страница 4: ...e data plate is sticked inside the front panel it contains all the technical data identifying the boiler and the type of gas for which the boiler is arranged 2 3 1 Connection of condensation water tra...

Страница 5: ...ow eaves 300 D below balcony 1 300 E from adjacent window 400 F from adjacent ventilation opening 600 G from horizontal or vertical soil or drain pipes 2 300 H from corner of building 300 I from reces...

Страница 6: ...on calculation in that the sum of the head losses of the single fittings is less than 15 5 mm H2O Inlet Outlet 7 m horizontal pipe 80 x 0 20 1 40 7 m horizontal pipe 80 x 0 30 2 10 n 2 90 elbows 80 x...

Страница 7: ...eed 15 5 mm H2O When calculating the lengths of pipe take into account the parameters given in the Table 2 2 8 60 PIPING SYSTEM A special kit allows to separate smoke outlet and air intake pipes The 8...

Страница 8: ...cables of section 0 5 mm2 First of all assemble and wire the socket 2 then insert the equipment which will start up as soon as it receives current To gain access to connector 3 remove the control pan...

Страница 9: ...electrode ER Sensing electrode TS 100 C safety stat V Fan TPA Water pressure transducer P Pump SE External sensor optional TA Room stat SM C H sensor blue TR Transformer 230 24V FL Flowmeter CR Logic...

Страница 10: ...rough a window contact Anti bacterial 2 10 1 Installation The unit must be installed in the main living room For installation follow the assembly instructions inserted in the package At this point wit...

Страница 11: ...nute of the prescribed delivery temperature value sent in C is limited to the imposed value With the activation of the adaptation the pre set value transmitted to the boiler regulator is adapted to th...

Страница 12: ...o par metro 64 1 0 activa s a sonda interna 0 externa 100 interna 50 valor m dio da sonda externa interna 100 activa s a sonda externa Para a regula o ambiente e a visualiza o utilizada a mistura pro...

Страница 13: ...egulated so as to obtain a pressure of approx 3 mbar at the burner for methane gas and 7 mbar for propane gas G31 To increase pressure turn the trimmer clockwise to reduce pres sure turn the trimmer c...

Страница 14: ...up There could have a break in the wire of the sensing electrode or the electrode itself is touching earth the electrode is worn out and needs replacing The con trol box is defective When there is a...

Страница 15: ...function of the flow in graph in fig 21 3 7 MAINS ELECTRICITY CONNECTION Use a separate electricity supply to con nect the room stats and relative zone val ves or pumps The micro or relay contact con...

Страница 16: ...2 Gas valve 3 Mixer intake 4 Ventilator intake 5 Nozzle 6 Fan 7 Air gas mixer 8 Air pressure switch 9 Digital pressure gauge Fig 24 0 30 20 10 p aria mm H2O Potenza termica kW 25 20 10 15 50 40 60 5 3...

Страница 17: ...G31 boilers it is a good idea to check that the position of the GPL bridge on the control board is correct Diaphragm code 6028640 Drawing 7 is assembled on the Dewy 25 model functioning on PROPANE G3...

Страница 18: ...sliding them out of their slots 4 6 CLEANING AND MAINTENANCE Preventive maintenance and checking of efficient operation of equipment and safety devices must be carried out exclusively by authorized te...

Страница 19: ...ing of the water C H TEMPERATURE ADJUSTMENT fig 2 The C H temperature can be adjusted by turning the knob of the C H potentiometer The set temperature is indicated on the red led scale from 35 80 C an...

Страница 20: ...out occurs again call local authorised Service Centre for technical assistance Other anomalies fig 6 When one of the red 40 80 C leds start flashing switch off the boiler and then try to ignite again...

Страница 21: ...utton automatic operation 4 Operating mode button manual operation 5 Operating mode button availability 6 Cover with instruction compartment 7 Temperature knob 8 Presence button Fig 8 KEY 1 Display ti...

Страница 22: ...l lowing list of items one after the other are displayed The thermo feeler continues to function independently of the display Day hour room temperature External temperature Hot water service temperatu...

Страница 23: ...ity boiler unit temperature desired for hot water service at reduced level To have access to the reduced hot water service temperature parameter press the and keys at the same time for at least 5 seco...

Страница 24: ...rature set in parameter 3 1 standard Hot water according to the daily heating programme In the comfort periods of the heating the temperature of the boiler unit is regulated at the value set via para...

Страница 25: ...of the heating characteristics curve When the room temperature set is not reached choose the gradient indicated in point 2 9 3 Display of the current boiler temperature Display of the current power of...

Страница 26: ...fficient water pressure Reset operation using the boiler charge valve fig 4 Plant overpressure Call an authorised Service Centre Safety thermostat trips Call an authorised Service Centre Fan air press...

Отзывы: