45
5.14.1 External sensor
Murelle Revolution 30
requires an outdoor probe. This is sup-
plied and MUST be connected because the boiler uses the out-
door temperature detected to operate.
m
CAUTION
The boiler CANNOT FUNCTION unless the outdoor probe
is installed
.
Climatic curve
Delivery temperature
30
10
20
0
-10
-20
-30
80
90
70
60
75
65
50
40
30
20
10
0
°C
°C
K=4
K=2
K=1
K=9 K=8
K=3
K=5
K=6
K=7
External temperature
k=4
Factory settings
Fig. 70
Procedure for selecting the climatic curve
To select the preferred climatic curve:
– from the
“Main screen”
on the main control panel (MCP)
Thu 18 Set 2014
Zone
10:30
Menu
Mode
Off
Fig. 71
– press the
Menu
button to view the
“Menu”
selection
screen
– turn the
encoder to select the
“TECHNICAL”
menu
Esc
Back
GENERAL SETTINGS [...]
INFORMATION
[...]
TECHNICAL
[...]
MENU
Fig. 72
– press the
click
encoder to access the modifiable area. The
following screen is displayed:
Cancel
Confirm
CONFIRM REQUEST
Confirm operation?
Fig. 73
– press the
Confirm
button to access the submenus
TECHNICAL
Esc
Back
State hybrid operation
[...]
Zone
heating
[...]
Ht-boiler adjust. param.
[...]
Hot water
[...]
Boiler parameters
[...]
Fig. 74
– turn the
encoder to select the
“Zone heating”
submenu
TECHNICAL
Esc
Back
Zone
heating
[...]
Ht-boiler adjust. param.
[...]
Hot water
[...]
Boiler parameters
[...]
Advanced parameters Ht
[...]
Fig. 75
– press the
click
encoder to access the modifiable parame-
ters area
Zone heating
Esc
BACK
Req. from ext. TA
NO
Room probe run
YES
Room probe modul.
YES
Ext. probe modul.
YES
Weather comp.curve
4.0
Fig. 76