Figure 7
–
Example of a purpose-made soakaway
Key
1
Condensate discharge pipe from boiler
2
Ground (this section of the condensate drainage pipe may be run either above or
below ground level); End cut at 45 °
3
Diameter 100 mm minimum plastic tube
4
Bottom of tube sealed
5
Limestone chippings
6
Two rows of three 12 mm holes at 25 mm centres, 50 mm from bottom of tube and
facing away from house
7
Hole depth 400 mm minimum by 300 mm diameter
8
Minimum internal diameter 19 mm
9
Pipe size transition point
10
Minimum internal diameter 30 mm
11
Water/weather proof insulation
41
Содержание MURELLE EQUIPE 220 ErP
Страница 26: ...26 6 CASCADE MANAGEMENT 2 INSTALLER BUTTONS cd...
Страница 43: ......
Страница 44: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it...