1.5 

COMBUSTION CHAMBER

The  combustion  chamber  is  of  the
straight  flow  type  and  complies  with
standard pr EN 303-3 appendix E. 
The dimensions are shown in fig. 3.

1.6

COMPATIBLE 
BURNERS

In  general,  the  oil  burner  that  is  com-
patible with the boiler should use spray
of the semi solid type.
Section 1.6.1  shows the matching table
of  the  burners  together  with  the  boi-
lers have been tested with.

1.6.2 Burners assembly

The boiler door details is shown in fig-
ure 4 for burner mounting.
The  burners  must  be  regulated  such
that  the  CO

2

value  is  that  indicated  in

point 1.3, with a tolerance of ± 5%.

R

M

4

5

6

6

7

0

120

20

100

40

80

60

1

2

3

0

4

1

3

2

13

C
E

8

9

11

12

10

U

1.4 

FUNCTIONAL DIAGRAM

L

270

280

Fig. 3

Fig. 2

L

Volume

mm

dm

3

Rondò/Estelle 3

305

17,5

Rondò/Estelle 4

405

24,0

Rondò/Estelle 5

505

30,5

Rondò/Estelle 6

605

37,0

Rondò/Estelle 7

705

43,5

R 75

ø 110

M8

Fig. 4

KEY

1Burner
2

Boiler

3

Boiler thermometer

4

Boiler drain 

5

Non-return valve 

6

Automatic air vent

7

D.H.W. pump

8

Magnesium anode

9

D.H.W. tank drain

10 D.H.W. storage tank
11

D.H.W. tank expansion vessel

12 D.H.W. tank safety valve
13 Hydrometer

1.6.1

“RIELLO” burners

Model

Nozzle

Atomising 

Pump pressure 

Tipo 

P min  P max

angle

P min 

P max

ø

ø

P min  P max 

bar

bar

Rondò/Estelle 3

RG0.1R

DELAVAN 0,50

0,60

60°W

60°W

11,5

12,0

Rondò/Estelle 4

RG1R

DELAVAN 0,65

0,75

80°W  60°W

12,5

13,0

Rondò/Estelle 5

RG1 R

DELAVAN 0,85

1,00

60°W

60°W

11,5

11,5

Rondò/Estelle 6

RG2

DELAVAN

1,00

1,10

60°W

60°W

10,0

10,0

Rondò/Estelle 7

RG2

DELAVAN

1,10

1,25

60°W

60°W

11,0

11,0

Содержание estelle

Страница 1: ...Rondò Estelle ...

Страница 2: ...CHNICAL FEATURES 25 1 4 FUNCTIONAL DIAGRAM 26 1 5 COMBUSTION CHAMBER 1 6 COMPATIBLE BURNERS 2 INSTALLATION 2 1 BOILER ROOM 27 2 2 BOILER ROOM DIMENSIONS 2 3 CONNECTING UP SYSTEM 2 4 CONNECTING UP FLUE 2 5 FITTING THE CASING RONDÒ 2 6 ELECTRICAL CONNECTION 28 3 USE AND MAINTENANCE 3 1 COMMISSIONING THE BOILER 30 3 2 LIGHTING AND OPERATION 3 3 REGULAR CLEANING 3 4 FROST POTECTION 32 3 5 USER WARNING...

Страница 3: ...e boiler unit BA100 BA150 BA200 ESTELLE for central heating only with combustion hinged door mat chable with a separate boiler unit BA100 BA150 BA200 The components for RONDÒ installa tion are supplied in three separate packages boiler body casing with enclosed documents and control panel 1 BOILER DESCRIPTION 460 850 280 P 55 95 505 625 ø 130 S M R 1 2 DIMENSIONAL DETAILS Fig 1 Rondò Estelle 3 4 5...

Страница 4: ...0 32 0 43 Water loss of head mbar 5 10 15 20 25 Combustion chamber pressure mbar 0 02 0 02 0 02 0 02 0 02 Suggested chimney depression mbar 0 07 0 13 0 14 0 18 0 17 0 23 0 32 0 37 0 34 0 45 Smokes temperature Minimum Maximum C 160 185 160 185 160 185 160 170 160 170 Smokes flow Minimum Maximum m3n h 24 0 31 6 32 4 41 4 42 9 52 8 54 8 63 3 65 5 73 8 Smokes volume dm3 9 12 15 18 21 CO2 12 5 12 5 12 ...

Страница 5: ... 1 4 FUNCTIONAL DIAGRAM L 270 280 Fig 3 Fig 2 L Volume mm dm3 Rondò Estelle 3 305 17 5 Rondò Estelle 4 405 24 0 Rondò Estelle 5 505 30 5 Rondò Estelle 6 605 37 0 Rondò Estelle 7 705 43 5 R 75 ø 110 M8 Fig 4 KEY 1 Burner 2 Boiler 3 Boiler thermometer 4 Boiler drain 5 Non return valve 6 Automatic air vent 7 D H W pump 8 Magnesium anode 9 D H W tank drain 10 D H W storage tank 11 D H W tank expansion...

Страница 6: ... with the standards starting the boiler will be difficult and there will be a consequent formation of soot condensate and encrustation The flue used to expel combustion products into the atmosphere must meet the following requirements be constructed with waterproof materials and resistant to smoke temperature and condensate be of adequate mechanical resilience and of low heat conductivity be perfe...

Страница 7: ...ted by fuses The room thermostat required for enhanced room temperature control should be installed as shown in fig 6 Connect the burner with the cable supplied NOTE SIME declines all responsibility for injury caused to persons due to failure to earth the boiler 2 6 1 Electrical connection to the BA boiler unit To connect the boiler to the boiler unit proceed with the following operations 28 KEY T...

Страница 8: ... of the boiler unit fig 7 connect the cables as shown in the diagram fig 6 a 29 L N 1 2 3 4 5 6 L N 1 2 3 4 5 6 B TS TC 1 2 C IG 1 2 C TB PB PI C NA NC C NA NC R KEY B Burner IG Main switch TS Safety stat TC Boiler stat R Relais PI C H pump PB D H W pump TB D H W stat NOTE When a room stat is to be fitted remove the link between terminal 1 and 5 on the connector plug Fig 6 a RONDÒ ESTELLE BA100 BA...

Страница 9: ...d range between 1 and 1 2 bar If the pressure is less than 1 bar reset the system 3 2 4 Turnig OFF boiler fig 7 To temporarily turn off the boiler turn off the electricity supply by pressing the main switch 1 The following operations must be car ried out if the plant will not be in use for a lengthy period of time position the main switch of the plant on off turn the fuel and water taps of the cen...

Страница 10: ...1 fixed with pin clutches remove the control panel 2 whose sides are fixed by two self tapping screws remove the right back panel 3 which is fixed to the side by two screws remove the left back panel 4 which is fixed to the sides by three screws remove the back panels 5 and 6 which are fixed to the sides by ten self tapping screws disassemble the left side 7 unscrewing the screws fixing it to the ...

Страница 11: ...iler the non obstruction of the smoke duct the real input supplied by the burner and its cleanness dust The boiler gets dirty easily Check the burner regulator smoke analysis the fuel quantity the flue obstruction and the cleanness of the air duct of the burner dust The boiler does not heat up Control the cleanness of the shell the matching the adjustment the burner performances the pre adjusted t...

Отзывы: