30
*All installations in England and Wales must be
to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance
will then be issued to the customer.
www.centralheating.co.uk
© Heating and Hotwater Industry Council (HHIC)
This Commissioning Checklist is to be completed in full by the competent person who commissioned the boiler as a means of demonstrating
compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference.
Failure to install and commission according to the manufacturer’s instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer’s statutory rights.
GAS BOILER SYSTEM COMMISSIONING CHECKLIST
Customer name:
Telephone number:
Address:
Boiler make and model:
Boiler serial number:
Commissioned by (PRINT NAME):
Gas Safe register number:
Company name:
Telephone number:
Company address:
Commissioning date:
CONTROLS
(tick the appropriate boxes)
Time and temperature control to heating
Room thermostat and programmer/timer
Programmable room thermostat
Load/weather compensation
Optimum start control
Time and temperature control to hot water
Cylinder thermostat and programmer/timer
Combination Boiler
Heating zone valves
Fitted
Not required
Hot water zone valves
Fitted
Not required
Thermostatic radiator valves
Fitted
Not required
Automatic bypass to system
Fitted
Not required
Boiler interlock
Provided
ALL SYSTEMS
’s instructions
Yes
What system cleaner was used?
What inhibitor was used?
Quantity litres
Yes
No
CENTRAL HEATING MODE
measure and record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (if applicable)
mbar
OR
Gas inlet pressure
mbar
°C
Central heating return temperature
°C
COMBINATION BOILERS ONLY
Is the installation in a hard water area (above 200ppm)?
Yes
No
Yes
No
DOMESTIC HOT WATER MODE
Measure and Record:
Gas rate
m³/hr
OR
ft³/hr
Burner operating pressure (at maximum rate)
mbar
OR
Gas inlet pressure at maximum rate
mbar
Cold water inlet temperature
°C
Hot water has been checked at all outlets
Yes
Temperature
°C
I/min
CONDENSING BOILERS ONLY
The condensate drain has been installed in accordance with the manufacturer’s instructions and/or BS5546/BS6798
Yes
ALL INSTALLATIONS
Record the following:
At max. rate: CO ppm
AND
CO/CO² Ratio
At min. rate: (where possible) CO ppm
AND
CO/CO² Ratio
The heating and hot water system complies with the appropriate Building Regulations
Yes
The boiler and associated products have been installed and commissioned in accordance with the manufacturer’s instructions
Yes
The operation of the boiler and system controls have been demonstrated to and understood by the customer
Yes
The manufacturer’s literature, including Benchmark Checklist and Service Record, has been explained and left with the customer
Yes
Commissioning Engineer’s Signature
Customer’s Signature
Содержание ECOMFORT PLUS 25 HE
Страница 3: ......
Страница 44: ...44 NOTES ...
Страница 45: ...45 NOTES ...
Страница 46: ...46 NOTES ...