FOR THE INSTALLATION TECHNICIAN
CONTENTS
1
DEVICE DESCRIPTION ........................................................................................................................page.....56
2
INSTALLATION.....................................................................................................................................page.....62
3
FEATURES............................................................................................................................................page.....71
4
USE AND MAINTENANCE ...................................................................................................................page.....74
IMPORTANT
When.turning.the.boiler.on.for.the.first.time.it.is.best.to.run.the.following.checks:
–. Make.sure.there.are.no.flammable.liquids.or.materials.in.the.boiler’s.near.vicinity.
–. Make.sure.that.electrical.connections.are.correct.and.that.the.grounding.wire.is.connected.to.a.
good.grounding.system.
–. Open.the.gas.tap.and.check.the.seal.on.the.fixtures.including.the.burner.
–. Make.sure.that.the.boiler.is.set.to.operate.with.the.type.of.gas.supplied.
–. Make.sure.that.the.exhaust.flue.is.free.and/or.correctly.assembled.
–. Make.sure.that.any.shutters.are.open.
–. Make.sure.that.the.system.was.filled.with.water.and.that.all.air.was.drained..
–. Make.sure.the.distributor.is.not.obstructed.
–. Discharge.any.air.in.the.gas.pipes.by.using.the.pressure.escape.on.the.gas.valve.
DEWY EQUIPE P100-P600 BOX -
ENGLISH