2.2.7
Initial start-up
The following phases must be completed in sequence:
1
Check that the pressure of the water distribution network to which the appliance must be connected does not exceed 4.5 bar. If it
does, install a pressure reducer on the delivery circuit.
2
Check that the pH value of the water lies between 6.5 and 7.5. If not, install a dosing pump to correct the pH value.
3
Carefully monitor the temperature of the water inside the calorifier, which must not exceed 95°C.
4
Carefully monitor the operating pressure which must be maximum 10 bar for fixed heat exchangers and for vitrified calorifiers
for DHW use (see “4.1.3 Dimensions and fittings” to page 48).
5
Install an expansion vessel having a volume equal to 4% of the rated capacity of each circuit to which the calorifier must be con-
nected (solar, DHW, primary circuits).
6
Install the relevant safety valves and non-return valves designed for these types of systems on the calorifier.
Key
1
Inlet filter
2
Pressure regulator
3
Shut-off cock
4
Safety valves (the opening should be at 8 bar)
5
Solar pump unit (with all integrated components: expansion vessel, safety valves, cocks, pressure gauge,
thermometers and flow meter)
6
Recirculation line pump
7
Deaerator near the collector
Note: the above diagram is purely indicative and must therefore be approved by a thermo-technical study
Fig. 8
COLD
WATER
INLET
Содержание BS 1S
Страница 27: ...27 IT...
Страница 53: ...53 EN...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ...Fonderie Sime S p A Via Garbo 27 37045 Legnago Vr Tel 39 0442 631111 Fax 39 0442 631292 www sime it...