Fonderie Sime SpA reserves the right to amend all of the product and relative accessories specifications without prior warning.
40
41
ENG
FR
- The systems are accessible for maintenance.
- The plant and fixing system are not exposed to strong winds developing at the ends and along the edges of the roof.
- The snow is removed.
GENERAL PREVENTION MEASURES
- The solar heat systems and relative piping must be installed respecting the health and safety and accident prevention
instructions.
- Keep the work place clear and without objects that can obstruct executing the work.
- Do not allow children, animals and other people to come into contact with the instruments or near the work place.
This rule must be respected, particularly when restructuring already existing buildings.
- Preserve the anti-freeze liquid in a safe place, away from the reach of children.
- Remove the devices and electric instruments of the current collector or protect them against an accidental switch-on
during maintenance execution, assistance or change in installation.
- Only use the instruments provided for this specific solar system. The use of other inadequate components or instru-
ments can cause accidents.
Personnel requirements
- The thermal solar systems must only be installed by qualified companies and trained personnel having appropriate
authorisation.
- Work on the plants and electric wires must only be carried out by qualified and trained electricians.
Personal protective equipment
- Wear protective goggles, adequate work clothes, protective shoes and helmet and a specific net for long hair.
- Do not wear wide clothes or jewellery as they may get caught up in the moving parts.
- Should the anti-freeze liquid come into contact with the eyes, despite using the protective goggles, keep the eyes open
and rinse them with running water.
- Wear the protective helmet during installation carried out level with or above the head level.
Boiler installation
- For boiler transport, assembly and installation, use suitable forklifts for the boiler dimensions and weight.
- Protect the glazed surface against impacts that might occur during transport and installation.
- There is a risk of accidents due to the boiler weight. Make sure the capacity of the support plan where the boiler will
be installed is also adequate for a full boiler.
Dismantling the system
The thermal solar system must only be dismantled by qualified companies and trained personnel having appropriate
authorisation. Only trained and qualified electricians can disconnect the electric parts.
Exhausted thermal solar systems must be disposed of in compliance with local regulations. Where possible, particular
attention must be paid to materials recycling.
PROTECTION AGAINST LIGHTNING
The metal parts of the entire system conform with the main requirements of Standard ELOT 1197 and the special protec-
tive requirements against lightning of Standard ELOT 1412 that considers the environmental conditions and the altitude.
Содержание 8500240
Страница 1: ...Fonderie Sime SpA cod 7500331A 07 2017 Rev 0 FR ENG SIME NATURAL 160S 200S 300 5 2S 320S ...
Страница 28: ...55 ...