E
N
SC
3
0
3
&
S
C
5
0
3
4
3. Overview
A - Battery (+)
B - Hub - GND (–)
C - 2 SiCOM ports
D - 1 JST socket for the temperature sensor
E - 2 voltage & 2 resistance inputs
4. Installation
CAUTION: Install the shunt module in a clean and dry place protected from
accidental spilling of liquids.
·
Remove the shunt cover by unscrewing four screws on top of the shunt cover.
To install the shunt use the supplied voltage cables and find a place no further
than 3 m away from the battery/battery bank. You can fix the shunt with the
supplied screws using two holes on the bottom of the casing.
·
Connect all cables.
·
Replace the shunt cover and screw the four screws on the cover of the shunt
unit.
4.1 Cables
For the SiCOM connection use the supplied cable. If not possible, use the
following table to determinate the correct cable type.
CABLES
Cable length
Cable type
< 5m
No limitations
>= 5m
2x2x0.25 mm2 twisted pair (recommended)