42C System Operations - 68
Maintenance of the
Trim Tab System
is
as follows:
Silverton recommends painting the trim
tabs with good quality, antifouling bottom
paint. DO NOT paint any hinges or the
moving parts of the cylinders.
To reduce the risk of electrolysis and
galvanic corrosion, Silverton recommends
the installation of sacri
fi
cial zinc anodes
on the trim tab plates at least once a year,
preferably during preparation for spring
launch. DO NOT paint the sacri
fi
cial zinc
anodes.
Periodically examine the trim tabs for
accumulation of underwater growth and
clean as necessary.
Periodically examine the trim tab pump
and hydraulic lines, which are located in
the bilge area, for leaks (Refer to the Me-
chanical Schematic in the Schematic Sec-
tion of this Owner’s Manual for the location
of the trim tab pump). Tighten connections
if leaks are noted. If the hydraulic lines ap-
pear worn or chafed, contact your Silver-
ton Dealer for inspection and replacement,
if necessary. The photo below shows the
trim tab pump.
Refer to the BENNETT TRIM TAB Man-
ual included with your Owner’s Packet
for technical information concerning the
operation and maintenance of the trim tab
system.
Содержание 42 C
Страница 1: ......
Страница 6: ...INTRODUCTION 6...
Страница 8: ...INTRODUCTION 8...
Страница 12: ...INTRODUCTION 12...
Страница 25: ...42C Getting Familiar 5 DECK...
Страница 28: ...42C Getting Familiar 8...
Страница 32: ...42C Getting Familiar 12...
Страница 34: ...42C Getting Familiar 14...
Страница 39: ...42C Getting Familiar 19 ENGINE COMPARTMENT...
Страница 58: ...SAFETY 18...
Страница 64: ...42C System Operations 6...
Страница 66: ...42C System Operations 8...
Страница 84: ...42C System Operations 26...
Страница 86: ...42C System Operations 28...
Страница 90: ...42C System Operations 32...
Страница 94: ...42C System Operations 36...
Страница 102: ...42C System Operations 44...
Страница 104: ...42C System Operations 46...
Страница 108: ...42C System Operations 50...
Страница 118: ...42C System Operations 60...
Страница 120: ...42C System Operations 62...
Страница 122: ...42C System Operations 64...
Страница 124: ...42C System Operations 66...
Страница 128: ...42C System Operations 70...
Страница 132: ...42C System Operations 74...
Страница 134: ...42C System Operations 76...
Страница 150: ...OPERATION 6...
Страница 158: ...GLOSSARY 6...
Страница 160: ...GLOSSARY 8...
Страница 161: ...GLOSSARY 9 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 162: ...GLOSSARY 10 MAINTENANCE LOG DATE MAINTENANCE PERFORMED HOURMETER...
Страница 164: ...GLOSSARY 12...
Страница 170: ...GLOSSARY 18...
Страница 174: ......
Страница 175: ......
Страница 176: ......
Страница 177: ......
Страница 178: ......
Страница 179: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ...42 CONVERTIBLE DECK...
Страница 185: ...42C...
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ...42 CONVERTIBLE INTERIOR...
Страница 195: ......
Страница 196: ...42 CONVERTIBLE Mechanical...
Страница 197: ...42 Convertible Port Thru Hulls...
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ...42 Convertible Starboard Thru Hulls...
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......