007-5926-002
15
Chapter 3
3.
Server Installation
This chapter provides a quick setup checklist to get the SGI Rackable C2112-4RP9 server
operational.
Unpack the System
Inspect the shipping container used for the server and note if it was damaged in any way. If the
server shows damage, file a damage claim with the carrier who delivered it.
Decide on a suitable location for the rack that supports the weight, power requirements, and
environmental requirements of the server. It should be situated in a clean, dust-free environment
that is well ventilated. Avoid areas where heat, electrical noise, and electromagnetic fields are
generated. Place the server rack near a grounded power outlet. Refer to
“Warnings and
Precautions” on page 16
.
Prepare for Setup
The shipping container should include two sets of rail assemblies, two rail mounting brackets and
the mounting screws that you will use to install the system into a rack.
Read this section in its entirety before you begin the installation procedure.
Содержание Rackable C2112-4RP9
Страница 1: ...SGI Rackable C2112 4RP9 System User Guide 007 5926 002 ...
Страница 4: ......
Страница 8: ......
Страница 10: ......
Страница 12: ......
Страница 22: ...6 007 5926 002 1 Introduction Figure 1 4 Serverboard Block Diagram ...
Страница 26: ......
Страница 46: ......
Страница 58: ......
Страница 62: ......
Страница 66: ......
Страница 68: ......