![Silicon Graphics Origin 300 Скачать руководство пользователя страница 69](http://html.mh-extra.com/html/silicon-graphics/origin-300/origin-300_user-manual_1271648069.webp)
Unloading and Moving System Equipment
007-4498-002
43
Transporting the Shipping Crate
Use a pallet jack with forks that are 48 in. (122 cm) long or longer to transport the
shipping crate to the designated location. Refer to Figure 2-3 and Figure 2-4 for the crate
dimensions and location to position the pallet jack. For system weight and dimensions,
contact site planning by e-mail ([email protected]) or by telephone (1 715 726 2820).
If the crate does not fit through all access doors, you may need to partially disassemble
the crate.
Caution:
If the system shipping or storage environment is significantly colder than the
environment in which it will be installed [40 degrees F (22 degrees C) or greater
disparity], leave the rack in its shipping crate for at least 24 hours at room temperature
before you start the installation. This acclimation prevents damage to the equipment that
could result from thermal shock and condensation.
!
Содержание Origin 300
Страница 1: ...SGI Origin 300 System with NUMAlink Module User s Guide 007 4498 002 ...
Страница 4: ......
Страница 26: ......
Страница 35: ...Base System Components 007 4498 002 9 Figure 1 7 Front and Rear Views of an SGI Origin 300 Base Module ...
Страница 39: ...Base System Components 007 4498 002 13 Figure 1 10 L2 Controller ...
Страница 49: ...Optional System Components 007 4498 002 23 Figure 1 17 SGI TP9400 Storage System ...
Страница 54: ...28 007 4498 002 1 Introduction Figure 1 18 Tape Drive Libraries L20 L40 L80 L180 L700 ...
Страница 71: ...Installing Your System 007 4498 002 45 Figure 2 5 Removing a Short Rack from the Shipping Crate Peg ...
Страница 78: ......
Страница 93: ...Disk Drives 007 4498 002 67 Figure 3 11 Installing a Disk Drive c Bezel door Disk drive Bezel door a b d ...
Страница 118: ......
Страница 264: ......