Commissioning and measuring operation
— VMZ.2
- 12 -
© SIKA • Ba_VMZ.2_en • 08/2020
6 Commissioning and measuring operation
Before switching on the VMZ.2 for the first time, please follow the instructions in the following
section.
6.1 Commissioning
Check that
the VMZ.2 has been installed correctly and that all screw connections are sealed.
the electrical wiring has been connected properly.
the measuring system is vented by flushing.
6.2 Switching on and off
The VMZ.2 has no switch and cannot be switched on or off on its own. Switching on and off
is carried out by the applied supply voltage.
Switch on the supply voltage.
The green LED lights up. The VMZ.2 is ready and goes into measuring mode.
6.3 Measuring operation
In the measuring mode, the green LED flashes proportional to the measured flow.
For the human eye, the flashing is no longer visible from a frequency of ~30...40 Hz.
The green LED then seems to light up permanently.
VMZ.2 with frequency output:
The VMZ.2 provides according to the version
a flow proportional NPN, PNP or Push-Pull
square wave signal.
The frequency of the pulse output changes
according to the flow (
Fig.).
VMZ.2 with analogue output:
According to the configuration of the VMZ.2, the analogue output provides a voltage or cur-
rent signal.
This signal is proportional to the measured flow. You will find the scaling of the analogue out-
put on the type plate.