Installation of VMZ.2
— VMZ.2
- 8 -
© SIKA • Ba_VMZ.2_en • 08/2020
4 Installation of VMZ.2
Before installing, check that
the wetted materials of the device are suitable for the media being used
(
the equipment is switched off and is in a safe and de-energised state.
the equipment is depressurised and has cooled down.
SUITABLE TOOLS:
Use only suitable tools of the correct size.
4.1 Installation instructions
CAUTION! Risk of malfunction due to external magnet-
ic fields!
Magnetic fields close to the device can cause malfunctions and
should be avoided.
Ensure that no external magnetic fields are present at the installa-
tion site of the VMZ.2.
•
The VMZ.2 can always be installed anywhere along the pipeline.
However, straight sections of piping are preferable.
Bubble-formation / run empty possible
Dirt deposits
possible
Run empty
possible
Dirt deposits
possible