Page 8 of 12 DocNo.DCP0001326 DSM 05/01/05 rev7
Input connections
Connecting the P2.200 to a SigNET iX LS
(prioritised mixer) including battery backup.
Important Note:
When replacing P2.200
amplifiers on site it must be ensured that the
iX LS model uses a 22Khz monitoring tone.
This will be shown by a sticker on the unit.
iX LS units without a sticker must be
replaced with 22Khz units.
(Older iX LS units
use a 20 Khz monitoring tone).
End of line units (supplied with the amplifier)
must also be fitted.
Connecting the P2.200 to a SigNET SS2n (Network station), including battery backup.
1.
SS2n feeding both amplifier modules
2.
SS2n feeding only one amplifier module
Connecting the P2.200 to an Integrity Mainframe.