
Page 23 of 45
Termination above Roof
Consult local codes for minimum vent cap height above the roof (X), vent must be a minimum of 2’ from any
wall.
Make sure the termination cap (part #1032) is securely fastened and sealed
to the 3” certified flex-pipe and the
existing 5” certified B-Vent pipe.
3.3.4 ROCK & GLASS INSTALLATION / ROCK & VERRE D'INSTALLATION
Step 1.
Sprinkle burner channel with glass. Make sure to cover the burner pan evenly. Then add decorative
rocks to outer pan area. / Saupoudrer le canal du brûleur avec verre. Assurez-vous de couvrir la
casserole du brûleur de façon égale. Puis ajoutez les roches décoratives à la zone pan extérieur.
Picture shows optional rock & glass kit. This shows
positions of media critical to correct flame pattern
Содержание BRADLEY-36-NG
Страница 40: ...Page 40 of 45 8 0 LABEL INFORMATION...
Страница 42: ...Page 42 of 45 APPENDIX A AMERICAN FLAME VALVE INFORMATION...
Страница 43: ...Page 43 of 45 APPENDIX A Continued...