8
Nut Assemblies
Parts Needed:
x4
Delrin anti-backlash nut
x8
M5-nylock nut
x4
M5-16mm bolt
x4
Locking ACME
nut & set screw
We will start with the hardware bag marked with a green sticker - dump the contents out. This hardware is
most of what’s needed for the first half of assembly so you can assume that hardware comes from here unless
mentioned otherwise.
Dumping out the green bag, you should see a bag containing some large hex nuts and small set screws. These are
called ‘locking ACME nuts’. Loosely thread each set screw into each ACME nut by about 2 turns. Prepare 4 pieces
and set them aside.
x4
Содержание LongMill MK2
Страница 1: ...1 LongMill MK2 Assembly Manual MK2 ...
Страница 7: ...7 Part 1 X Z Axes ...
Страница 22: ...22 Part 2 Y Axis Gantries ...
Страница 34: ...34 You should now have two Y axis rail assemblies They should be a mirror copy of each other ...
Страница 35: ...35 Part 3 Axes Completion ...
Страница 44: ...44 Part 4 Motors Wiring ...
Страница 62: ...62 Part 5 Checks First Moves ...
Страница 77: ...77 Part 6 Table Mounting ...