71
X-gantry Open
X-gantry Closed
To perform ‘tensioning’ the idea is to loosen the M5 bolt with an Allen key far enough that you can rotate the
eccentric nut (picture 1) all the way ‘open’ as the starting point. Then, turn the nut whichever direction you choose
to close it slightly (picture 2) and re-tighten the M5 bolt with the Allen key (picture 3). At this point you’ll want
to check both the wheel you just tightened as well as its static wheel on the opposite side of the rail. Whichever
wheel is on top will always be harder to spin, but ideal tensioning is when the lower wheel is able to barely turn
when you use your fingers to rotate it.
Use Wrench & M5 Allen Key
Содержание LongMill MK2
Страница 1: ...1 LongMill MK2 Assembly Manual MK2 ...
Страница 7: ...7 Part 1 X Z Axes ...
Страница 22: ...22 Part 2 Y Axis Gantries ...
Страница 34: ...34 You should now have two Y axis rail assemblies They should be a mirror copy of each other ...
Страница 35: ...35 Part 3 Axes Completion ...
Страница 44: ...44 Part 4 Motors Wiring ...
Страница 62: ...62 Part 5 Checks First Moves ...
Страница 77: ...77 Part 6 Table Mounting ...