7.0
Cable Manager Installation
1
Install included vertical managers into equipment rails by installing into square
holes and rotating 45° into locking position
2
Managers may either be installed flush to front of equipment rails or…
3
proud of the equipment rails
INS_100.22796.00_WallMT_B.qxp_A 2/18/20 8:34 AM Page 11