
18
SFIDK.PS.029.Q3.02
Signal conv. inst.
5. Signal converter installation
SITRANS F US SONOFLO
®
®
®
®
®
5.
Signal converter
installation
5.1 Signal converter
compact version
Removal of display window (24 V version)
All signal converter readings are accessed by
pressing the rubber button on the display win-
dow. When setting the converter or turning the
keypad the display window must be removed.
Setting prior to installation
By using a 9 V alkaline battery the flowmeter
can be set before final installation. This is
especially advantageous if the flowmeter is to
be installed before the system is put into
operation.
1. Fit the SENSORPROM
®
unit from the sensor
terminal box under the signal converter as
shown. Connect the battery.
2. To protect the pins, place the signal conver-
ter in the packaging base supplied.
3. Set the signal converter as described under
"Starting up".
The SENSORPROM
®
unit is now program-
med with the required settings.
4. Remove the battery and replace the SEN-
SORPROM
®
unit in the terminal box. The
flowmeter is now ready for operation.
5. Mount the signal converter.
Turning the keypad (24 V version)
1. Insert a screwdriver under the lower edge of
the keypad.
2. Remove the keypad.
3. Check to ensure that the gasket is mounted
correctly.
4. Turn the control pad. The top corner must
always be inserted first. Press the keypad
well down into the gasket recess.
5. Now, with thumb pressure, ease the gasket
edge over the keypad while pressing lightly
on the centre of the pad.
SONO 3000 24 V IP 67, order no. 7ME3150-1AA20-1AA0, is delivered with a 24 V terminal
mounted on the bottom plate. This 24 V terminal replaces the 230 V terminal on the termination
plate on SONO 3300 sensors or on the wall mounting kit FDK:085F5027.
SONO 3300 and wall mounting kit is supplied with 230 V terminals as standard.