9.6.8
Replacing the DC-link reactor
Removing the DC link reactor
Figure 9-11
DC link reactor
To install the DC link reactor, proceed as follows:
1. Unscrew the cabinet center upright and remove.
2. Loosen the lugs that secure the DC link reactor.
3. Separate the busbar connections.
4. Undo the water pipe connections.
5. Slide the DC link reactor out of the cabinet.
Installing the DC link reactor
To install the DC link reactor, proceed as follows:
1. Slide the DC link reactor onto the U-rail as far as the stop.
2. Screw the center upright back into the cabinet.
3. Secure the DC link reactor on both sides with the lugs provided.
Maintenance
9.6 Repairs
3rd Party LCI Control Upgrade
Operating Instructions, 02/2022, A5E31872818
135
Содержание SINAMICS MV 9LD4110-7EX70-1AA0
Страница 2: ......
Страница 60: ...Description 3 5 Options 3rd Party LCI Control Upgrade 58 Operating Instructions 02 2022 A5E31872818 ...
Страница 114: ...Operation 8 5 Fault and system messages 3rd Party LCI Control Upgrade 112 Operating Instructions 02 2022 A5E31872818 ...
Страница 140: ...Spare parts 3rd Party LCI Control Upgrade 138 Operating Instructions 02 2022 A5E31872818 ...
Страница 144: ...Service Support 3rd Party LCI Control Upgrade 142 Operating Instructions 02 2022 A5E31872818 ...
Страница 153: ......