4.2.2
Requirements placed on the levelness of the floor
Ensure that the following requirements are satisfied:
• The floor is completely horizontal and flat.
• The doors can be opened and closed. The locking systems function correctly.
• Flat parts and components, e.g. doors and side panels, seal correctly. Only then is the degree
of protection maintained.
4.3
Inspections when receiving the delivery
4.3.1
Checking shock and tilt indicators
The purpose of shock and tilt indicators
The unit is equipped with shock and tilt indicators to monitor for damage during transit.
Carefully check the shock and tilt indicators before commissioning the device.
WARNING
Danger to life as a result of unsafe operation
Safe operation of the device is not guaranteed if the shock or tilt indicator has tripped
(responded)
This can result in death, serious injury or material damage.
• If one of the indicators has tripped, do not perform any commissioning.
• Inform the Technical Support. Only specialist Siemens technicians can recommend
appropriate measures.
See also
Preparations for use
4.3 Inspections when receiving the delivery
3rd Party LCI Control Upgrade
66
Operating Instructions, 02/2022, A5E31872818
Содержание SINAMICS MV 9LD4110-7EX70-1AA0
Страница 2: ......
Страница 60: ...Description 3 5 Options 3rd Party LCI Control Upgrade 58 Operating Instructions 02 2022 A5E31872818 ...
Страница 114: ...Operation 8 5 Fault and system messages 3rd Party LCI Control Upgrade 112 Operating Instructions 02 2022 A5E31872818 ...
Страница 140: ...Spare parts 3rd Party LCI Control Upgrade 138 Operating Instructions 02 2022 A5E31872818 ...
Страница 144: ...Service Support 3rd Party LCI Control Upgrade 142 Operating Instructions 02 2022 A5E31872818 ...
Страница 153: ......