
Options
9.2 Hand-held device
Intelligent Operating Panel 2 (IOP-2)
76
Operating Instructions, 06/2020, FW V2.6, A5E39549448B AH
Note
Battery order information
The batteries supplied with the IOP-2 Hand-held Kit should be replaced with exactly the same
type of batteries. The batteries that have been tested for use with the IOP-2 are given below:
Company: GP Batteries
Order Number: GP210AAHC
The batteries can be ordered from the following website: GP Batteries
http://www.gpbatteries.com/INT/index.php
The layout of the IOP-2 hand-held device is shown in the figure below.
Figure 9-3
IOP-2 Handheld kit layout
1.
Intelligent Operator Panel (IOP-2)
2.
IOP-2 release catch
3.
ON/OFF switch
4.
Charging LED - ON when charging, OFF when charged
5.
9-pin Sub-D male connector (RS232)
6.
Charging unit input
7.
Battery compartment cover
8.
IOP-2 retaining screw