
When installing the V ring, proceed in the same way as when installing the labyrinth ring.
1. Grease the axial sealing surface. The shaft seating remains ungreased.
2. Push the V ring
②
onto the shaft.
The correct axial position of the V ring for the design with grease chamber has been reached
if the V ring sits approx. 0.2 mm behind the edge of the shaft heel. This position is the result
of installing the labyrinth sealing ring.
①
Felt ring
③
Labyrinth sealing ring
②
V ring
④
Grease chamber
Figure 9-6
Rolling bearing with grease chamber (schematic diagram)
See also
9.3.6.7
Installing the labyrinth sealing ring
The labyrinth sealing ring is the last component to be fitted when fitting the rolling bearing. It
ensures degree of protection IP65 and prevents the penetration of dirt and foreign bodies into
the rolling bearing.
1. Apply a soluble adhesive to the three set screws such as Loctite 243) and screw them
partially into the labyrinth sealing ring.
2. Apply an corrosion protection paint to the shaft in the area of the labyrinth sealing ring.
Maintenance
9.3 Corrective maintenance
1MB5 SH 400/450
130
Operating Instructions, 05/2019, A5E45959221A
Содержание SIMOTICS XP 1MB5 SH400
Страница 2: ......
Страница 10: ...Table of contents 1MB5 SH 400 450 8 Operating Instructions 05 2019 A5E45959221A ...
Страница 64: ...Assembly 5 4 Aligning and fixing the machine 1MB5 SH 400 450 62 Operating Instructions 05 2019 A5E45959221A ...
Страница 106: ...Operation 8 8 Non operational periods 1MB5 SH 400 450 104 Operating Instructions 05 2019 A5E45959221A ...
Страница 154: ...Disposal 11 5 Disposal of components 1MB5 SH 400 450 152 Operating Instructions 05 2019 A5E45959221A ...
Страница 156: ...Service support 1MB5 SH 400 450 154 Operating Instructions 05 2019 A5E45959221A ...
Страница 160: ...Quality documents 1MB5 SH 400 450 158 Operating Instructions 05 2019 A5E45959221A ...
Страница 165: ......
Страница 166: ...Germany More information www siemens com drives Siemens AG Digital Industries Postfach 48 48 90026 NÜRNBERG ...