Commissioning
7.2 Checklists for commissioning
S-1FK7 DYA G2 synchronous motors with planetary gearbox
Operating Instructions, 05/2018, A5E44881183B AA
77
Table 7- 2
Checklist (2) - checks regarding the mechanical system
Check
OK
Have all touch protection measures for moving and live parts been fitted and are they
functional?
Has the motor been correctly mounted and aligned?
Can you rotate the rotor without it touching the stator?
Have all fastening screws, fastening elements, and electrical connections been tight-
ened with the prescribed torques and properly attached?
Do the operating conditions correspond to the data specified on the rating plate?
Do the output elements have the correct setting conditions according to type?
Examples:
•
Have the couplings been aligned and balanced?
•
Has the belt drive tension been correctly adjusted?
•
Have the gear tooth flank and gear tooth tip play as well as radial play been cor-
rectly adjusted for geared outputs?
Table 7- 3
Checklist (3) - checks regarding the electrical system
Check
OK
Has the motor been connected so that it rotates in the specified direction?
Have the minimum insulation resistance values been maintained?
Have the grounding and equipotential bonding connections been correctly estab-
lished?
Is the specified limit speed n
max
maintained during the operation on the converter?
Table 7- 4
Checklist (4) - Monitoring equipment checks
Check
OK
Has it been ensured that speeds higher than the maximum speed n
max
cannot be
reached?
Have all supplementary motor monitoring devices been correctly connected and are
they working properly?
Table 7- 5
Checklist (5) - Cooling system checks
Check
OK
Natural cooling
Have you adjusted the torque or the power of the motor at the converter based on the
table in Chapter "Derating factors (Page 28)"?
Follow the Operating Instructions of the converter.
Table 7- 6
Checklist (6) - Checks regarding the optional brake
Check
OK
Is the brake open when the operating voltage is applied?
Does the brake open and close correctly?