Type of construction IM B3
Use the coolant drain hole
②
in the bearing shield to drain the coolant.
①
Coolant connection
②
Coolant connection and coolant drain hole
Other types of construction
In other types of construction, you must blow the coolant out with compressed air.
8.8
Re-commissioning the machine
When you re-commission the machine, proceed as follows:
● Study the record made when the machine was decommissioned, and reverse the measures
that were taken for conservation and storage.
● Perform the measures listed in the "Commissioning" section.
See also
8.9
Switching on again after an emergency switching-off
● Check the machine before recommissioning the driven machine after an Emergency Off.
● Eliminate all the causes that have led to the emergency off
Operation
8.8 Re-commissioning the machine
SIMOTICS FD 1LH1
116
Operating Instructions 01/2019
Содержание SIMOTICS FD 1LH1
Страница 2: ...23 01 2019 19 26 V11 01 ...
Страница 28: ...Description SIMOTICS FD 1LH1 28 Operating Instructions 01 2019 ...
Страница 72: ...Assembly 5 5 Connecting the cooling water supply SIMOTICS FD 1LH1 72 Operating Instructions 01 2019 ...
Страница 122: ...Operation 8 10 faults SIMOTICS FD 1LH1 122 Operating Instructions 01 2019 ...
Страница 140: ...Maintenance 9 2 Corrective Maintenance SIMOTICS FD 1LH1 140 Operating Instructions 01 2019 ...
Страница 162: ...Disposal 11 5 Disposal of components SIMOTICS FD 1LH1 162 Operating Instructions 01 2019 ...
Страница 164: ...Service and Support SIMOTICS FD 1LH1 164 Operating Instructions 01 2019 ...
Страница 168: ...Quality documents SIMOTICS FD 1LH1 168 Operating Instructions 01 2019 ...
Страница 173: ......