Commissioning
7.2 Switching on
Standard motors SH 63 ... 355
Operating Instructions, 12/2018, A5E38483075A
83
3.
If it runs perfectly, connect a load.
NOTICE
Thermal overload of motors connected directly to the line supply
In addition to the load torque, the ramp-up (accelerating) time is essentially influenced
by the moment of inertia to be accelerated. While ramping up when connected to the
line supply, the inrush (starting) current is a multiple of the rated current. This can result
in thermal overload. This can damage the motor.
As a consequence, when ramping up, observe the following:
•
Monitor the ramp-up time and number of consecutive starts.
•
Comply with the limit values and/or ramp-up conditions specified in the catalog or the
order documentation.
4.
During the test run, check and document the following:
–
Check whether it is running smoothly.
–
Document the voltage, current and power values. As far as possible, document the
corresponding values of the driven machine.
–
If this is possible using the available measuring equipment, check the bearing and
stator winding temperatures until they have reached steady-state values.
–
Check the machine for noise or vibrations on the bearings or bearing shields as it
runs.
5.
In case of uneven running or abnormal noise, switch off the machine. As the machine
runs down, identify the cause.
–
If the mechanical operation improves immediately after the machine is switched off,
then the cause is magnetic or electrical.
–
If the mechanical running does not improve immediately after switching the machine
off, then the cause is mechanical.
- Imbalance of the electrical machine or the driven machine
- The machine set has not been adequately aligned
- The machine is being operated at the system resonance point. System = motor, base
frame, foundation, ...
NOTICE
Serious damage to the machine
If the vibration values in operation are not maintained in accordance with DIN ISO
10816-3, then the machine can be mechanically destroyed.
•
During operation, observe the vibration values in accordance with
DIN ISO 10816-3.
Содержание SIMOTICS DP series
Страница 1: ......
Страница 2: ......
Страница 62: ...Assembly 5 4 Installing the machine Standard motors SH 63 355 60 Operating Instructions 12 2018 A5E38483075A ...
Страница 86: ...Commissioning 7 2 Switching on Standard motors SH 63 355 84 Operating Instructions 12 2018 A5E38483075A ...
Страница 98: ...Operation 8 7 Deactivating Standard motors SH 63 355 96 Operating Instructions 12 2018 A5E38483075A ...
Страница 118: ...Maintenance 9 3 Corrective maintenance Standard motors SH 63 355 116 Operating Instructions 12 2018 A5E38483075A ...
Страница 140: ...Disposal 11 6 Disposal of components Standard motors SH 63 355 138 Operating Instructions 12 2018 A5E38483075A ...
Страница 150: ......