Disposal
11
11.1
Introduction
Protecting the environment and preserving its resources are corporate goals of the highest
priority for us. Our worldwide environmental management system to ISO 14001 ensures
compliance with legislation and sets high standards in this regard. Environmentally friendly
design, technical safety and health protection are always firm goals even at the product
development stage.
Recommendations for the environmentally friendly disposal of the machine and its components
are given in the following section. Be sure to comply with local disposal regulations.
11.2
RoHS - restricting the use of certain hazardous substances
In compliance with RoHS ("Restriction of certain Hazardous Substances" ) we replace
substances that are damaging to the environment by those that are not based on state-of-the-
art technology. In doing so, safety in operation and handling will take priority at all times.
11.3
Country-specific legislation
Note
Country-specific legislation
When disposing of the machine or of waste that is created during the individual phases of its
life cycle, please observe the statutory requirements applicable in the country of use.
11.4
Dismantling the machine
Dismantle the machine using the general procedures commonly used in mechanical
engineering.
WARNING
Machine parts can fall
The machine is made up of heavy parts. These parts are liable to fall during dismantling. This
can result in death, serious injury or material damage.
Before you release any machine parts, secure them so that they cannot fall.
SIMOTICS DC 1GG6
Operating Instructions 02/2016
135
Содержание SIMOTICS DC 1GG6
Страница 2: ...08 02 2016 10 27 V4 00 ...
Страница 12: ...Table of contents SIMOTICS DC 1GG6 12 Operating Instructions 02 2016 ...
Страница 14: ...Introduction 1 1 About these instructions SIMOTICS DC 1GG6 14 Operating Instructions 02 2016 ...
Страница 62: ...Electrical connection 6 11 Completing connection work SIMOTICS DC 1GG6 62 Operating Instructions 02 2016 ...
Страница 70: ...Commissioning 7 8 Switch off SIMOTICS DC 1GG6 70 Operating Instructions 02 2016 ...
Страница 82: ...Operation 8 9 Faults SIMOTICS DC 1GG6 82 Operating Instructions 02 2016 ...
Страница 104: ...Maintenance 9 2 Repair SIMOTICS DC 1GG6 104 Operating Instructions 02 2016 ...
Страница 138: ...Service and Support SIMOTICS DC 1GG6 138 Operating Instructions 02 2016 ...
Страница 142: ...Quality documents SIMOTICS DC 1GG6 142 Operating Instructions 02 2016 ...
Страница 148: ...Checklists D 4 Inspection when the motor is running SIMOTICS DC 1GG6 148 Operating Instructions 02 2016 ...
Страница 152: ...W Wall face 39 Wall mounting 39 Water drain holes 45 Index SIMOTICS DC 1GG6 152 Operating Instructions 02 2016 ...
Страница 153: ......
Страница 154: ...Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www siemens com drives ...