5.4.3
Lift the machine to where it will be mounted and position it
• For vertical installation, use all the eyebolts provided and when necessary, hoisting straps
according to DIN EN 1492-1 and/or lashing straps according to DIN EN 12195-2 to stabilize
the position.
• Prevent foreign bodies from falling into the fan cover. For vertical machine installation with
the shaft end facing downwards, attach a protective canopy.
• If the shaft extension is facing upwards, the user must prevent liquid from moving along the
shaft and entering the motor.
• Clean bare metal surfaces with anti-corrosion agent using white spirit to ensure proper
installation and / or machine mounting.
• Do not obstruct the ventilation. Do not draw in the hot discharged air directly – also from
adjacent equipment.
• Avoid exposing them to direct, intense solar radiation, rain, snow, ice, or also dust for
extended periods. Attach a covering structure or an additional cover when using or storing
outdoors.
• Do not exceed the permissible axial and radial forces.
5.4.4
Machines with type of construction IM B15, IM B9, IM V8 and IM V9
Types of construction without bearings on the drive side
These machines do not have their own bearing system for the machine shaft at the drive end
(DE). The machine shaft is accepted by the (hollow) shaft or coupling of the system or driven
machine.
• Using the centering edge, the machine is aligned with respect to enclosures, flanges or
driven machines.
• Note that the temperature of the motor and motor shaft increases during operation. The
thermal expansion of the machine shaft must be compensated by the customer by applying
suitable measures.
Use the spring washers provided to locate the NDE bearing without any play.
NOTICE
Damage to the motor
Material damage can occur if the following notes are not carefully observed:
• The IM B3 bearing shield with integrated distance ring mounted at the drive end (DE) is only
used transport lock. A warning label is attached to this bearing shield.
• The spacer ring is not a roller bearing.
• Remove the bearing shield and the spacer ring.
• Remove the transport lock before commissioning.
Assembly
5.4 Installing the machine
1FU9
Operating Instructions, 07/2020, A5E46712792A
47
Содержание SIMOTICCS A 1FU9
Страница 1: ...Operating Instructions 1FU9 SIMOTICS A 07 2020 Edition Synchronous motors www siemens com ...
Страница 2: ......
Страница 42: ...Preparing for use 4 11 Converter operation 1FU9 40 Operating Instructions 07 2020 A5E46712792A ...
Страница 58: ...Assembly 5 6 Installing the machine 1FU9 56 Operating Instructions 07 2020 A5E46712792A ...
Страница 80: ...Commissioning 7 3 Switching on 1FU9 78 Operating Instructions 07 2020 A5E46712792A ...
Страница 110: ...Spare parts 1FU9 108 Operating Instructions 07 2020 A5E46712792A ...
Страница 120: ...Technical data B 1 Tightening torques 1FU9 118 Operating Instructions 07 2020 A5E46712792A ...
Страница 124: ...Index 1FU9 122 Operating Instructions 07 2020 A5E46712792A ...
Страница 125: ......
Страница 126: ...Germany www siemens com drives Siemens AG Digital Industries Motion Control Postfach 31 80 91050 ERLANGEN ...