88
During electrical installation, all rules and regulations
for power systems must be observed.
•
If current transformers are used, the secondary
connections of the current transformers must be short-
circuited before the current leads to the device are
interrupted.
•
The protective ground terminal of the device must be
connected to the protective ground of the panel or
cubicle.
•
For connection of an auxiliary DC voltage, the correct
polarity must be used.
•
All of the terminals should be checked to verify proper
connections.
•
The polarities and phasing of all instrument
transformers should be checked.
•
Before initial energization with supply voltage, the
device shall be situated in the operating area for at least
two hours to ensure temperature equalization and to
avoid humidity and condensation problems.
Содержание SIMEAS P 7KG7100
Страница 12: ...9 1 7 Prinzipschaltbild Basisgerät Das Gehäuse der RS485 Schnittstelle ist mit dem Schutzleiter PE verbunden ...
Страница 26: ...23 1 11 2 Gerätevarianten 7KG7500 7KG7600 und 7KG7610 Hinweis Alle Maße in mm Breite des Gerätes 144 mm ...
Страница 32: ...29 1 12 3 Gerätevariante 7KG7610 Achtung Erdung muss an SIMEAS P immer angeschlossen sein V ...
Страница 41: ...38 Einphasen Wechselstrom Dreileiter Drehstrom gleiche Belastung ...
Страница 42: ...39 Dreileiter Drehstrom beliebige Belastung Vierleiter Drehstrom gleiche Belastung ...
Страница 55: ...52 Notizen ...
Страница 64: ...61 2 7 Block Diagram Basic device The housing of the RS 485 interface is connected with protective ground PG ...
Страница 76: ...73 2 11 Dimensions NOTE All dimensions in mm 2 11 1 For Devices 7KG7100 and 7KG7200 Width of the device 94 mm ...
Страница 78: ...75 2 11 2 For Devices 7KG7500 7KG7600 and 7KG7610 NOTE All dimensions in mm Width of the device 144 mm ...
Страница 84: ...81 2 12 3 For Devices 7KG7610 Attention Ground needs to be connected to the SIMEAS P prior operation V ...
Страница 93: ...90 Single phase AC current Three wire three phase balanced ...
Страница 94: ...91 Three wire three phase unbalanced Four wire three phase balanced ...
Страница 95: ...92 Four wire three phase unbalanced low voltage system Four wire three phase unbalanced high voltage system ...
Страница 107: ...104 Notes ...