
Contents
S7-300 Programmable Controller Hardware and Installation
A5E00105492-01
vii
8-11
Direct Data Exchange with CPUs 31x-2 DP/31xC-2 DP.................................8-35
9-1
Unlocking the front connector and removing the module .................................9-6
9-2
Removing the front connector coding pin .........................................................9-7
9-3
Installing a new module.....................................................................................9-7
9-4
Inserting the front connector .............................................................................9-8
9-5
Replacing the backup battery in CPU 313/314 .................................................9-9
9-6
Location of fuses in the digital output module 120/230 VAC ..........................9-12
10-1
Principle of Forcing with S7-300 CPUs (all CPUs except 318-2 DP) .............10-3
10-2
Status and error displays of 31xC CPUs ........................................................10-7
10-3
Diagnostics with CPU 31x-2 (315-2-DP as of 315-2AF03)...........................10-12
10-4
Diagnostic addresses for DP masters and DP slaves ..................................10-13
10-5
Diagnostic address for the receiving station with direct data exchange .......10-15
10-6
Diagnostic addresses for DP masters and DP slaves ..................................10-19
10-7
Structure of slave diagnostic data .................................................................10-22
10-8
Structure of module diagnostics of CPU 31x-2 .............................................10-25
10-9
Structure of the module status ......................................................................10-26
10-10
Structure of the interrupt status for CPU 31xC .............................................10-27
10-11
Byte y+4 to y+7 for Diagnostic/Process interrupts ........................................10-28
11-1
Possible paths of electromagnetic interference ..............................................11-3
11-2
Example of an EMC compatible cabinet installation .......................................11-9
11-3
Example of EMC compatible wall-mounting .................................................11-11
11-4
Mounting cable shielding...............................................................................11-13
11-5
Equipotential bonding....................................................................................11-14
11-6
Lightning protection zones of a building........................................................11-20
11-7
Sample circuitry for networked S7-300 PLCs ...............................................11-26
11-8
EMERGENCY-OFF relay contact in the output circuit..................................11-28
11-9
Circuit for coils operated with DC voltage .....................................................11-29
11-10
Circuit for coils operated with AC voltage .....................................................11-29
Содержание Simatic S7-300
Страница 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Страница 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Страница 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Страница 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Страница 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Страница 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Страница 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Страница 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...