Configuring
S7-300 Programmable Controller Hardware and Installation
4-10
A5E00105492-01
Rules: Interference-proof installation of the connection
Special shielding and grounding measures are not required if you interconnect the
CU and ED using suitable interface modules (Send IM and Receive IM). However,
make sure that
•
all module racks are interconnected with low impedance,
•
the module racks of a grounded assembly are grounded in a star pattern,
•
the contact springs of the module racks are clean and not bent in order to
ensure interference current diversion.
Example of a full assembly
The figure shows the arrangement of modules in an S7-300 assembly on 4 module
racks.
PS
CPU
SMs
IM
Connecting cable
368
Rack 0
(ZG)
Rack 1
(EG)
Rack 2
(EG)
Rack 3
(EG)
IM
Connecting cable 368
IM
Connecting cable 368
IM
Not with
CPU 314 IFM/CPU 31xC
Figure 4-5 Full assembly
Содержание Simatic S7-300
Страница 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Страница 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Страница 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Страница 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Страница 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Страница 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Страница 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Страница 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...