Installation
S7-300 Programmable Controller Hardware and Installation
A5E00105492-01
5-7
5.3
Installing modules on the profile rail
Prerequisite
•
Your S7-300 PLC is fully configured.
•
The profile rail is installed.
Order of the modules
Snap the modules onto the profile rail, starting at the left and in the following order:
1. Power supply module
2. CPU
3. signal modules, function modules, communication modules, interface modules
Note
If you install SM 331 analog input modules, please check before installation
whether you have to reposition the measuring range submodules at the side of
the module. See Chapter 4 on analog modules in the Module specifications
Reference Manual.
Содержание Simatic S7-300
Страница 10: ...Contents S7 300 Programmable Controller Hardware and Installation x A5E00105492 01 ...
Страница 16: ...Preface S7 300 Programmable Controller Hardware and Installation 1 6 A5E00105492 01 ...
Страница 22: ...Quick Guide S7 300 Programmable Controller Hardware and Installation 2 6 A5E00105492 01 ...
Страница 28: ...Product overview S7 300 Programmable Controller Hardware and Installation 3 6 A5E00105492 01 ...
Страница 74: ...Configuring S7 300 Programmable Controller Hardware and Installation 4 46 A5E00105492 01 ...
Страница 102: ...Wiring S7 300 Programmable Controller Hardware and Installation 6 18 A5E00105492 01 ...
Страница 148: ...Commissioning S7 300 Programmable Controller Hardware and Installation 8 36 A5E00105492 01 ...
Страница 236: ...Glossary S7 300 Programmable Controller Hardware and Installation 12 16 A5E00105492 01 ...