Commissioning
9.1 Commissioning the PN/CAN LINK
SIMATIC PN/CAN LINK
96
Operating Instructions, 03/2022, A5E39895388-AC
6.
Set SIMATIC CPU to "RUN" operating state. The corresponding configuration data is
automatically downloaded from the S7-CPU to the PN/CAN LINK.
7.
When the S7 program sets the control bit in the cyclic IO image to "1", the left "RUN" status
LED on the PN/CAN LINK lights up green and signals that the device is in error-free operating
state.
Note
In "CANopen Manager" mode, bit 2 must also be set to "1" in the control information
transmitted from the S7-CPU to the PN/CAN LINK (see Control and status information
(Page 46)).
Result
Successful commissioning of the PN/CAN LINK.
Содержание SIMATIC PN/CAN LINK
Страница 1: ......