2
2-2
PG 760 Programming Device
C79000-G7076-C761-01
2.1
Setup and Hardware Components of the PG 760
Unpack your PG 760 as follows:
1. Remove the packing.
2. Do not throw the original packing away. Keep it in case you have to ship
or transport the unit again at some time in the future.
3. Check the packing list to make sure that no components are missing.
4. Enter the serial numbers of all connected devices into the table (in the
Product Bulletin, according to options). If a device is reported as stolen, it
can only be recognized when submitted for repair by means of its serial
number.
!
Caution
Risk of damage!
When transporting the unit in cold weather, when it may be submitted to
extreme variations in temperature, make sure that there is no moisture
(condensation) on or in the unit.
The unit must be allowed to reach room temperature before you switch it on.
If condensation has formed, you should wait approximately 12 hours before
switching on the unit.
Figure 2-1 Setting up a Tower
Proceed as follows:
1. Place the PG 760 on a horizontal, flat surface.
The ventilation slots on the front (with the slider open) and on the rear
must not be covered.
2. Set up the monitor and keyboard as appropriate. Use the short or long
keyboard cable depending on the situation.
3. Connect the monitor and keyboard.
Unpacking Your
PG 760
Setting up a
Tower
Unpacking and Setting Up the PG 760