4-1
PG 720 P Programming Device
C79000-G7076-C721-02
Installing and Operating the PG 720
This chapter describes what you have to do to set up your PG 720 correctly
for operation. This includes:
The basic steps for commissioning your PG 720
Working in the battery mode and changing the battery
Working with memory submodules and cards for the programmable logic
controllers
Connecting your PG 720 to other devices.
Section
Contents
Page
4.1
Connecting the PG 720 to the Power Supply
4.2
Battery Operation
4.3
Connecting I/O Devices
4.4
Working with SIMATIC S5 Memory Submodules
4.5
Working with SIMATIC Memory Cards
4.6
Working with PCMCIA Cards
4.7
Connecting the PG 720 to other SIMATIC S5 Units
4.8
Connecting the PG 720 to a SIMATIC S7 Network
(MPI/DP)
4.9
Networking the PG 720 with Other Stations on PROFIBUS
4.10
Networking the PG 720 and Other Computers on Industrial
Ethernet
What Does This
Chapter Contain?
Chapter
Overview
4