Chapter
1
Introduction
1-6
SIMATIC HawkEye™ 1600T Smart Camera Guide
Rev. 1E, Nov 2007
Effective Frame Per Second & Pipeline Operation Formulas
Use the following formula to calculate effective FrameRatePerSecond in a
SIMATIC Visionscape® Job:
Where:
VS Overhead is typically:
Interrupt L Framework Overhead = 0.5 msec max
Or
In Table 1–2, EFPS is given in PowerStrobe with 1msec Integration time and Job
in full pipeline, meaning that the Job tools + idle processing time, i.e., less than
(IT + VFT + 0.5) above.
Full Pipeline = (AVT Avp Processing Time + IDT Inspection Idle Time +
LossLess Connection Overhead) < (IT + VFT + VSO) idle time is defaulted to
3% of the Inspection Time as defined in the VisionSystemStep property page.
1000.0
EFPS =
----------------------------------------------------------------------------------------------------
(IT Integrati VFT VendorFra VSO VS Overhead) in msec
1000.0
EFPS =
-----------------------
(IT + VFT + 0.5)
Содержание SIMATIC HawkEye 1600T Series
Страница 1: ...SIMATIC HawkEye 1600T Smart Camera Guide EM 40247 1E Rev 1E Nov 2007 ...
Страница 4: ......
Страница 8: ...Contents viii SIMATIC HawkEye 1600T Smart Camera Guide Rev 1E Nov 2007 ...
Страница 42: ...Chapter 3 Optics Lighting 3 4 SIMATIC HawkEye 1600T Smart Camera Guide Rev 1E Nov 2007 ...
Страница 64: ...Appendix C Specifications C 8 SIMATIC HawkEye 1600T Smart Camera Guide Rev 1E Nov 2007 ...
Страница 78: ...Appendix E Updating Firmware on 1600T Cameras E 10 SIMATIC HawkEye 1600T Smart Camera Guide Rev 1E Nov 2007 ...