3-1
SIMATIC Field PG P4 Manual
A5E00180080-04
Configuring And Operating The SIMATIC
Field PG P4
What Does This Chapter Contain?
The chapter below describes all tasks required to successfully set up your
workplace. These include:
•
initial steps for commissioning your SIMATIC Field PG P4,
•
working with battery operation and replacing the battery,
•
connecting peripheral devices,
•
working with memory submodules for the PLC and
•
connecting your PG to other devices.
Chapter Overview
Section
Description
Page
3.1
Unpacking and Setting Up the SIMATIC Field PG P4
3.2
Connection to the Power Supply
3.3
Battery Operation
3.4
Commissioning
3.5
Panel “Field PG”
3.6
Connecting Peripheral Devices
3.7
Working with SIMATIC-S5 memory submodules
3.8
Working with SIMATIC Memory Cards
3.9
Working with Micro Memory Cards
3.10
Working with PC Cards
3.11
Connecting the Field PG P4 to a SIMATIC S5 Network
3.12
Connecting the Field PG P4 to a SIMATIC S7 Network (MPI/
DP)
3.13
Networking the Field PG P4 with Other Stations on PROFI-
BUS
3.14
Ethernet (RJ45 Ethernet Interface)
!
Warning
When connecting long signal lines (especially for plant-wide connections), make
sure that the signal lines are connected to the local equipotential grounding system
(cable shield connected to protective conductor).
3
Содержание SIMATIC Field PG P4
Страница 8: ...Preface viii SIMATIC Field PG P4 Manual A5E00180080 04 ...
Страница 12: ...Contents xii SIMATIC Field PG P4 Manual A5E00180080 04 ...
Страница 18: ...Important Notes 1 6 SIMATIC Field PG P4 Manual A5E00180080 04 ...
Страница 92: ...Error Diagnostics 6 2 SIMATIC Field PG P4 Manual A5E00180080 04 ...
Страница 126: ...Technical Specifications B 6 SIMATIC Field PG P4 Manual A5E00180080 04 ...