Installation
5.2 Installing the mounting rail
ET 200MP Distributed I/O System
System Manual, 01/2013, A5E03723484-01
43
Preparing the 2000 mm mounting rail for installation
1.
Cut the 2000 mm mounting rail to the required length.
2.
Mark the holes. The necessary dimensions can be found in the table "Dimensions for the
drill holes":
–
Two drill holes at the beginning and end of the mounting rail
–
Additional drill holes at equal intervals of 500 mm maximum, along the identification
groove
3.
Drill the marked holes according to the selected type of fastening.
Note
In order to ensure a secure installation of the modules, make sure that the drill holes are
located centrally on the identification groove, and that only screws of the maximum size
are used (see the table named above).
①
Drill hole
②
Identification groove for additional drill holes
③
Additional drill hole
Figure 5-2
Preparing the 2000 mm mounting rail for installation
Installing the mounting rail
Place the mounting rail such that sufficient space remains for installation of and heat
dissipation from the modules. Note Figure 5-1 Minumum clearances in the control cabinet
(Page 40).
Screw the rail onto the mounting surface.
Содержание simatic ET 200MP
Страница 4: ...Preface ET 200MP Distributed I O System 4 System Manual 01 2013 A5E03723484 01 ...
Страница 8: ...Table of contents ET 200MP Distributed I O System 8 System Manual 01 2013 A5E03723484 01 ...
Страница 22: ...Product overview 2 4 Properties ET 200MP Distributed I O System 22 System Manual 01 2013 A5E03723484 01 ...
Страница 76: ...Wiring 6 9 Marking the I O modules ET 200MP Distributed I O System 76 System Manual 01 2013 A5E03723484 01 ...
Страница 118: ...Service Support ET 200MP Distributed I O System 118 System Manual 01 2013 A5E03723484 01 ...
Страница 126: ...Index ET 200MP Distributed I O System 126 System Manual 01 2013 A5E03723484 01 ...