A-6
ET 200L Distributed I/O Device
EWA-4NEB 780600902-05
You require one of the manuals listed in Table A-5 to program and commis-
sion the ET 200L with STEP 7.
Table A-5
Manuals for STEP 7 and SIMATIC S7
Manual
Contents
S7-300 Programmable Controller
Hardware and Installation
Includes
S
Description of the PROFIBUS-DP interface of
CPU 315-2 DP
S
Installing a PROFIBUS-DP network
S
Bus connector and RS 485 repeater
M7-300 Programmable Controller
Hardware and Installation
Includes
S
Description of the PROFIBUS-DP interface in
M7-300
S
Installing a PROFIBUS-DP network
S
Bus connector and RS 485 repeater
S7-400, M7-400 Programmable
Controllers
Hardware and Installation
Includes
S
Description of the PROFIBUS-DP interface in
S7-400 and M7-400
S
Installing a PROFIBUS-DP network
S
Bus connector and RS 485 repeater
System software for S7-300 and S7-400
Program Design
Programming manual
Includes
Description of addressing and diagnostics on
SIMATIC S7
System software for S7-300 and S7-400
System and Standard Functions
Reference manual
Description of the SFCs in STEP 7
You require one of the manuals listed in Table A-5 to program and commis-
sion the ET 200L with COM ET 200.
Table A-6
Manuals for ET 200 on SIMATIC S5
Manual
Order Number
Contents
ET 200 distributed
I/O device
6ES5 998-3ES12
S
Description of master interface IM 308-C for
S5-115U/H, S5-135U and S5-155U/H
S
Description of the S5-95U with PROFIBUS-DP master
interface
S
Handling COM ET 200 Windows
S
Handling FB IM308C
Manuals for
STEP 7 and SI-
MATIC S7
Manual for ET 200
on SIMATIC S5
Order Numbers