SICAM FCG Device  

6MD2340

  

 

 

 

                     

       

 

 

 

 

 

Product Information  

E50417-X1040-C584-A3, Edition  09.2016 

 

 

NOTE 

To avoid a short circuit on the battery contacts, the 

battery may only be removed with a non-conductive 

tool (for example plastic tweezers). 

3.  Insert the battery into the battery compartment with the polarity 

imprinted on the top side of the device. 

4.  Press the cover of the battery compartment back into the 

housing and make sure it is in the correct position. 

 

NOTE 
Battery disposal 

For disposing the batteries it is necessary to observe 

the local national/international directives. 

 

DIN-rail assembly 

 
Mount the device on a DIN rail that is specified in the standard EN 60750.  
1.  Pull down the release handle at the snap-on clip and hold it in  

this position.  

2.  Slide the device with the guiding of the snap-on clip onto one  

side of the DIN rail and then to the desired position. 

3.  Release the release device. The device is now firmly mounted  

on the DIN rail.  

 

NOTE 

The snap-on clip is adjusted to a certain height 

setting by the manufacturer. You can change this 

position if necessary. To do so, lever the release 

device out of its guiding (no special tool required)  

and move the release device into the desired 

position. Subsequently, press the release device 

back into its guiding. 

 
Communication Mobile 

 

Danger

 

Risk of lightning strikes when installed outdoors 

Non-observance leads to death or serious injury

If you install an antenna outside, the antenna must be 

grounded to protect it from lightning strikes. This work 

must only be carried out by qualified personnel. Antennas 

installed outdoors must be within the area covered by a 

lightning protection system. Make sure that all conducting 

systems entering from outdoors can be protected by a 

lightning protection potential equalization system. When 

implementing your lightning protection concept, make 

sure you adhere to the VDE 0182 or IEC 62305 standard. 

Commissioning 

1.  Check that the operational data match the rated data on the label and 

the technical data of the device. This applies in particular to the supply 

voltage and to the maximum values. 

2.  Connect the desired devices to the terminals and plug connectors (see 

figure 1). 

3.  Install the SIM card and connect the GSM antenna according to Device 

Manual. 

4.  Switch on the connected peripheral devices and the supply voltage of 

the device. 

 

NOTE 

The device does not have a power on/off switch. 

Switch on/off the supply voltage at the respective 

isolating device or at the external power supply. 
The cable length between SICAM FCG and the 

external power supply must not exceed 0.5 m.   

 

 

NOTE 

Use copper conductors only.  

 

 

NOTE 

Field wires of control circuits shall be separated from 

other circuits with respect to the end use 

requirements. 

 

Operation 

Prerequisites 
Most control functions require the input of passwords. This applies to all 

entries affecting the device functions. 
No password is required to read out data, indications, and diagnostic data. 

 

 

NOTE 

The device comes delivered with the following default 

passwords: 
- Activation password: 

000000 

- Maintenance password: 

311299

 

Once commissioning has been completed, you should change the 

passwords to protect the device against unintentional changes and 

operation by unauthorized persons. How to change the passwords is 

described in the device manual. 
The devices are operated via the connected PC using web browser. 
Operation is described in detail in the respective device manual. In the 

following, the most important settings are described: 
The graphical user interface is stored in the device. To display the user 

interface, start Microsoft Internet Explorer 8.0 (or higher) and enter the IP 

address (default IP address: 192.168.0.55; also see label on the side of 

the device) of the device. 
You can navigate through browser (for example Microsoft Internet 

Explorer) using the icons on the toolbar, for example back, forward, print 

etc. The user interface itself does not contain any navigation icons. 
The following table lists the control elements: 

 

Control Element 

Control Function 

 

Option button: selects one option 

 

List box: selects an item from a list 

 

Button: Executing an action by 

clicking the button, that is the 

current settings on the user 

interface are transmitted to the 

device. 

 

Active tab (light blue) 

 

Inactive tab (dark blue) 

 

Selects and opens the item to be 

activated, for example a tab 

 

Содержание SICAM FCG

Страница 1: ...excluded We do not provide any technical support for the Product if it has been modified Notes on Safety This document contains notes that must be adhered to for your own personal safety and to avoid damage to property However it does not constitute a complete description of all safety measures required for installation service and maintenance of the equipment module device in question Details are...

Страница 2: ...way that meets the requirements of standard ISO 2248 Check the packing for external transport damage Damaged packing may indicate that the devices inside have also sustained damage Unpack devices carefully do not use force Visually check the devices to ensure that they are in perfect mechanical condition Check the enclosed accessories against the delivery note to make sure that everything is compl...

Страница 3: ...ltage and to the maximum values 2 Connect the desired devices to the terminals and plug connectors see figure 1 3 Install the SIM card and connect the GSM antenna according to Device Manual 4 Switch on the connected peripheral devices and the supply voltage of the device NOTE The device does not have a power on off switch Switch on off the supply voltage at the respective isolating device or at th...

Страница 4: ...f the device is stored for an extended period of time Siemens recommend to connect the device to the supply voltage for 1 or 2 days once a year to reform the electrolytic capacitors in the device This procedure should also be carried out before operating the device Transport SICAM FCG with 1 contained lithium metal cell button cell with 0 07 g lithium content meets the preconditions of Special Pro...

Страница 5: ...nsmission rate 10 100 Mbit s Cable for 100Base T 100 Ω to 150 Ω STP CAT5 Maximum cable length 100Base T 100 m if installed GSM Antenna and Antenna Interface Requirements for Antenna Type Fixed antenna For use in industrial environment acc to EN IEC 61010 1 Ed 3 CAT III Detached antenna For remote installation in residential commercial and light industrial environments EN IEC 61010 1 Ed 3 CAT III A...

Страница 6: ...sulation Test Power supply Rated voltage DC 12 or DC 24 V no insulation Ethernet interface Insulation SELV Rated voltage DC 50 V insulation test voltage DC 700 V Rated voltage DC 50 V insulation test voltage AC 1500 V Binary outputs Insulation reinforced CAT III Rated voltage 300 V Insulation test voltage AC 3 51 kV Binary inputs Insulation reinforced CAT III Rated voltage Block P 300 V Rated volt...

Страница 7: ... 5 Hz to 8 Hz 7 5 mm amplitude 8 Hz to 150 Hz 2 g acceleration Frequency sweep 1 octave min 20 cycles in 3 orthogonal axes Shock IEC 62586 1 class 1 IEC 60068 2 27 test Ea Semi sinusoidal 15 g acceleration duration 11 ms Each 3 shocks in both directions of the 3 axes Shock IEC 62586 1 class 1 IEC 60068 2 29 test Eb Semi sinusoidal 10 g acceleration duration 16 ms Each 1000 shocks in both direction...

Страница 8: ...s Product Information E50417 X1040 C584 A3 Edition 09 2016 1 SICAM FCG Terminal Side 2 SICAM FCG DIN Rail Side 3 SICAM FCG Device Top Side Cover of Battery Compartment 4 SICAM FCG DIN rail Assembly 5 SICAM FCG Dimension Drawing ...

Отзывы: