Online replacement (OLR)
6
U24802-J-Z146-2-7600
RM400 C Models
69
D
o
k
u
s
c
h
abl
on
en V
e
rs
io
n
3
.2
v
om
2
5
.10.
9
3
©
S
ie
m
en
s
N
ix
d
o
rf
I
n
fo
rm
a
ti
o
ns
s
y
s
te
m
e A
G
199
3
Dr
u
c
k
v
o
m
12
.
0
4
.1
9
99 16
:1
7.
17
P
fad:
H:
\C
h
ri
s
to
p
h
\M
anu
al
e\
P
D
F
\R
M
\R
M
4
00C
B
e
tr
iebs
an
le
it
ung
\eng
lis
c
h
\r
m
4
00.
k
0
6
Ê
Pull the OLR shuttle about 2 cm out.
Figure 40: Pull the drive shuttle only half-way out
Ê
Wait for 30 seconds, until it is certain that the drive has stopped rotating.
Ê
Pull the drive’s OLR shuttle all the way out of its bay, keeping a hand under it
for safety’s sake.
Do not carry the drive by the OLR shuttle’s handle. This handle is only
intended to help you pull the drive out of its bay.
Even with a defective disk drive, never touch the pin array on the back of
the OLR shuttle. Electrostatic discharges may destroy the drive
electronics.
Ê
Carefully place the defective drive, with its large surface facing down, in the
original packaging of the new drive.
!
Содержание RM400 C Series
Страница 1: ...Edition March 1997 RM400 C Models Operating Manual Reliant UNIX SINIX ...
Страница 5: ...Data media Equipment care Technical data Equipment settings Accessories Reference section and Index ...
Страница 220: ......
Страница 222: ......
Страница 224: ......
Страница 226: ......