SD39RIO-1 INSTALLATION
January 2001
2-9
Figure 2-5 Cable Tie Points for Strain Relief
IMPORTANT
APACS+ and QUADLOG hardware is certified to meet certain safety agency
(EMC, CSA) vibration, and temperature standards. To ensure that test certifications
are not violated, note the following:
•
ESD covers and dust covers on unused connectors must be attached at all times.
•
Cables must be secured at all times by screwlock mechanisms.
•
No unauthorized modifications are allowed to APACS+ or QUADLOG products.
2.5 IOBUS Cable and Shunt/Jumper Connections
The IOBUS is redundant (sides A and B) and can have a maximum capacity of 40 nodes defined as one
control module and up to 39 I/O modules. The actual nodal capacity depends upon the type of rack used or
the combination of racks used (see section 2.2.2).
A minimum node IOBUS consists of two modules: a control module and an I/O module; however, the control
module must reside in a SIXRAC or a MODULRAC to communicate over the MODULBUS (M-BUS). The
IOBUS capacity of a Remote I/O Rack is fixed at four modules (nodes) and cannot be configured into
separate segments; however, the Remote I/O Rack’s IOBUS can continue into other Remote I/O Racks,
SIXRACs, MODULRACs, or UNIRACs. IOBUS cables and shunts (see Figures 2-6 through 2-10) are used
to establish the physical length of an IOBUS.
Содержание QUADLOG
Страница 2: ......
Страница 16: ...INSTALLATION SD39RIO 1 January 2001 2 4 Figure 2 2 Remote I O Rack Dimensions ...
Страница 23: ...SD39RIO 1 INSTALLATION January 2001 2 11 Figure 2 6 IOBUS Connections SIXRAC to Remote I O Rack ...
Страница 24: ...INSTALLATION SD39RIO 1 January 2001 2 12 Figure 2 7 IOBUS Connections Remote I O Rack to Remote I O Rack ...
Страница 25: ...SD39RIO 1 INSTALLATION January 2001 2 13 Figure 2 8 IOBUS Connections MODULRAC to Remote I O Rack ...
Страница 29: ...SD39RIO 1 INSTALLATION January 2001 2 17 Figure 2 11 W2072 Cable End Preparation ...
Страница 34: ...INSTALLATION SD39RIO 1 January 2001 2 22 Figure 2 14 W2040 Cable End Preparation ...
Страница 39: ...SD39RIO 1 INSTALLATION January 2001 2 27 Figure 2 17 Belden 8627 Cable End Preparation ...
Страница 54: ...INSTALLATION SD39RIO 1 January 2001 2 42 Figure 2 31 Rack and I O Module Keying ...
Страница 64: ...SPECIFICATIONS SD39RIO 1 January 2001 6 4 ...
Страница 66: ......