background image

4

Figure 3

Setting S1 on the ANN-1 Board

To assemble the MBK-RK:
1. Remove the four screws from the four

standoffs on the rear side of the MKB-RK
plate.

2. Position the MKB-3 panel over the four

standoffs on the rear side of the MBK-RK
plate, being sure that the MKB-3 panel fits
into the cutout on the plate.

3. Replace the four screws on the standoffs and

tighten them securely.

4. Mount the MKB-RK to its recommended

location on the rack. Refer to Table 1 and
Figures 6 and 7 to determine the correct
location for your system.

TSP-40 Installation

The TSP-RK has two components:
1. U-shaped plate with studs (See Figure 4).

2. A dress plate with a clear lens.

To assemble the TSP-RK:

1. Mount the TSP-40 printer to the studs using the

hardware and installation instructions
supplied with the printer. In this application,
use the instructions for mounting the TSP-40
in an MBR-1 backbox.

2. After installing the printer to the plate, mount

the plate to the rack using hardware supplied
with the rack. Refer to the SYSTEM
ASSEMBLY
 section below and Figures 6
(with Voice) and 7 (without Voice), for the
recommended location on the rack.

3. Mount the dress plate onto the rack with the

clear lens centered over the printer paper.
Fasten in place using hardware supplied with
the rack.

SYS-RK Installation

The SYS-RK has two components (See Figure 5):
1. An 8

3

/

8

 X 19" plate with studs.

2. A U-shaped plate with studs.

To assemble the SYS-RK:
1. Mount the 8

3

/

8

 X 19" plate on the rear of the

rack. Refer to the SYSTEM ASSEMBLY
section and Figure 6 for the recommended
location on the rack.

2. Place the six holes in the U-shaped plate over

the six studs in the 19" rack plate. Secure the
U-shaped plate in place using the six 8-32
nuts provided.

3. Install the EL-410D over the four studs on the

U-shaped plate using the four 8-32 nuts
provided.

STUDS

Figure 4

TSP-RK U-shaped Plate with Studs

Содержание MXL Series

Страница 1: ... Road Florham Park New Jersey 07932 Siemens Building Technologies Ltd 2 Kenview Boulevard Brampton Ontario L6T 5E4 CN TABLE 1 MXL MXLV RACK MOUNT KITS RACK MOUNT KIT MOUNTS MODULE S PLACEMENT ON RACK PANEL HEIGHT X WIDTH TYPE OF SYSTEM ACM RK ACM 1 MMM 1 PIM 1 TBM 1 and TMM 1 Front 17 1 2 X 19 MXLV MKB RK MKB 3 PIM 1 Front 12 1 4 X 19 MXL MXLV MMB RK MMB 1 or PSR 1 Rear 12 1 4 X 19 MXL MXLV MOM RK...

Страница 2: ...tion instructions provided with the module See Table 2 for a list of installation instructions Refer to Figure 2 when assembling the ACM RK to determine correct module placement and cabling connections MKB 3 Installation Remove all system power before installation first battery and then AC To power up connect the AC first and then the battery Setting the Network Address See Figure 3 1 Before insta...

Страница 3: ...Use switch S1 SW5 on the ANN 1 to select or deselect supervision If your ANN 1 has a switch with position 1 indicated on the left hand side ignore the printing on the switch SW1 on S1 is at the extreme right hand side of S1 regardless of any other marking To set for supervision S1 SW5 Closed ON To set for non supervision S1 SW5 Open OFF NOTE When you select non supervision for an annunciator there...

Страница 4: ...ons for mounting the TSP 40 in an MBR 1 backbox 2 After installing the printer to the plate mount the plate to the rack using hardware supplied with the rack Refer to the SYSTEM ASSEMBLY section below and Figures 6 with Voice and 7 without Voice for the recommended location on the rack 3 Mount the dress plate onto the rack with the clear lens centered over the printer paper Fasten in place using h...

Страница 5: ...back of the rack 3 The ACM RK must be mounted below the MKB RK 4 The MOM RK must be mounted below the MMB RK 5 The MPS RK must be mounted below the MOM RK 6 The MMB RK must be mounted directly behind the ACM RK 7 The TSP RK must be located within 24 inches of the MMB RK 8 The VSM RK must be mounted directly below the ACM RK Using the CABLES RK Kit The CABLES RK kit P N 500 893044 has five cables f...

Страница 6: ...ase be sure to follow standard wiring practices 4 E L B A T T I K K R S E L B A C 4 4 0 3 9 8 0 0 5 N P E L B A C E P Y T F O E P Y T M E T S Y S S E C A L P E R S D N E T X E R O S T C E N N O C S E L U D O M E L B A C H T G N E L n o b b i R r o t c u d n o C 4 1 V L X M s e c a l p e R 1 P 1 M C A o t 3 P 1 M M T 4 2 n o b b i R r o t c u d n o C 5 1 V L X M s e c a l p e R 4 P 1 M C A o t P 1 ...

Страница 7: ... Manual P N 315 092036 TABLE 6 Module Termination ALD 2 ALD 2I CMI 300 CSM 4 CZM 4 MMB 1 2 NET 4 7 NIM 1R PIM 1 PSR 1 OCC 1 REP 1 TBM 2 XLD 1 ZAC 30 ZCT 8B MOM 4 MOM 4 MOM 4 MOM 4 MOM 4 TB1 1 4 TB2 1 4 TB3 1 4 TB4 1 9 TB5 1 12 MOM 4 TB1 TB1 1 6 TB4 1 4 TB3 1 4 OMM 1 MOM 4 TB4 All positions TB5 All positions MOM 4 OMM 1 OMM 1 TABLE 5 Module Termination ASC 1 2 Power from EL 410D Batteries CRM 4 CSM...

Страница 8: ...8 Figure 6 MXLV with Voice Mounted on 19 Rack 12 1 4 17 1 2 7 7 12 1 4 9 17 1 2 12 70 8 3 8 ...

Страница 9: ...9 Figure 7 MXL without Voice Mounted on 19 Rack 12 17 1 2 9 12 1 4 12 1 4 70 ...

Страница 10: ...10 Figure 8 Installing the Wiring Duct ...

Страница 11: ...11 ...

Страница 12: ...P N 315 093402 9 Siemens Building Technologies Inc 8 Fernwood Road Florham Park New Jersey 07932 Siemens Building Technologies Ltd 2 Kenview Boulevard Brampton Ontario L6T 5E4 CN ...

Отзывы: