Appendix
A.6 List of abbreviations
Getting Connected to MindSphere
90
Getting Started, 05/2018
Protective measures against discharge of static electricity
●
Disconnect the power supply before you install or remove modules which are sensitive to
ESD.
●
Pay attention to good grounding:
– When handling electrostatic sensitive devices, make sure that persons, the
workstation and devices, tools and packaging used are properly grounded. This way
you avoid static discharge.
●
Avoid direct contact:
– As a general rule, do not touch electrostatic sensitive devices, except in the case of
unavoidable maintenance work.
– Hold the modules at their edge so that you do not touch the connector pins or
conductor paths. This way, the discharge energy does not reach and damage the
sensitive components.
– Discharge your body electrostatically before you take a measurement at a module. Do
so by touching grounded metallic parts. Always use grounded measuring instruments.
A.6
List of abbreviations
Abbreviation
Description
DMZ
Demilitarized Zone (referred to a perimeter network)
GUI
Graphical User Interface
HTTPS
Hyper Text Transfer Protocol Secure
IoT
Internet of things
IoT2040
MindConnect IoT2040
IP
Internet Protocol
LAN
Local Area Network
MCN
MindConnect Nano
MSU
MindSphere Unit
NAPT
Network Address and Port Translation
OEM
Original Equipment Manufacturer
OPC UA
Open Platform Communications Unified Architecture
PC
Personal Computer
S7
STEP 7
UI
User Interface
Содержание MindConnect IoT2040
Страница 15: ...Overview of MindConnect Elements Getting Connected to MindSphere Getting Started 05 2018 15 ...
Страница 16: ......
Страница 30: ......
Страница 40: ......
Страница 65: ...Configuring data in Asset Manager 7 4 Datamapping Getting Connected to MindSphere Getting Started 05 2018 65 ...
Страница 66: ......
Страница 74: ......
Страница 91: ...Appendix A 6 List of abbreviations Getting Connected to MindSphere Getting Started 05 2018 91 ...
Страница 92: ......