8.8.2
Avoidance of damage to roller bearings during stoppages
Extended stoppages at the identical or almost identical resting position of the roller bearings
can lead to damage such as brinelling or formation of corrosion.
● During stoppages, regularly start the machine up for a brief period once a month, or at least
turn the rotor over several times.
If you have uncoupled the machine from the driven machine and secured the rotor with a
rotor shipping brace, then remove this before turning the rotor over or starting the machine
up.
Make sure that the resting position of the roller bearings after the rotor has been turned
over is different from what it previously had been. Use the fitted key or the coupling halves
as reference markers.
● During re-commissioning, refer to the information in the "Commissioning" section.
See also
8.9
Decommissioning the machine
NOTICE
Damage as a result of an extended period out of service
If the machine is going to be out of service for longer than six months, then take the necessary
measures for preservation and storing. Otherwise damage to the machine will result.
Record the decommissioning steps. This log will be useful upon recommissioning.
8.10
Re-commissioning the machine
When you re-commission the machine, proceed as follows:
● Study the record made when the machine was decommissioned, and reverse the measures
that were taken for conservation and storage.
● Perform the measures listed in the "Commissioning" section.
See also
Start-up (Page 65)
Decommissioning the machine (Page 80)
Operation
8.10 Re-commissioning the machine
LOHER CHEMSTAR 1PS2
80
Operating Instructions 08/2016
Содержание LOHER CHEMSTAR 1PS2
Страница 2: ...04 08 2016 11 45 V3 00 ...
Страница 12: ...Introduction 1 1 About these instructions LOHER CHEMSTAR 1PS2 12 Operating Instructions 08 2016 ...
Страница 38: ...Preparations for use 4 13 Transport and storage LOHER CHEMSTAR 1PS2 38 Operating Instructions 08 2016 ...
Страница 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Страница 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Страница 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Страница 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Страница 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Страница 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Страница 121: ...Quality documents C C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 Operating Instructions 08 2016 121 ...
Страница 122: ...Quality documents C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 122 Operating Instructions 08 2016 ...
Страница 138: ...Quality documents C 2 IECEx certificate LOHER CHEMSTAR 1PS2 138 Operating Instructions 08 2016 ...
Страница 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...
Страница 143: ...AD EC Declaration of Conformity U161 ...
Страница 144: ...Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www siemens com drives ...