4.13.1
Transport markings
The packing differs depending on the transport type and size. If not otherwise contractually
agreed, the packaging corresponds to the packing guidelines for International Standards for
Phytosanitary Measures (ISPM).
Note the symbols which appear on the packing. These have the following meanings:
Top
Fragile material Keep dry Keep cool Center of
gravity
Do not use
hand hook
Attach here
4.13.2
Checking the delivery
The components are assembled on an individual basis. When you take receipt of the delivery,
please check immediately whether the scope of the delivery matches up with the
accompanying documents. No claims relating to defects/items missing from the delivery will
be accepted if they are submitted at a later date.
● Report any apparent transport damage to the delivery agent immediately.
● Immediately report any apparent defects/missing components to your contact partner.
These Operating Instructions are part of the scope of delivery; keep them in a location where
they can be easily accessed.
4.13.3
Attaching the rotor locking device
NOTICE
Bearing damage caused by vibration
If storage conditions are inappropriate there is a risk of bearing seizure damage. This can
result in material damage, such as damage to bearings caused by vibration.
● On machines that have been supplied with a rotor shipping brace, secure the rotor as per
the notes on transportation.
● Protect the machine against strong radial vibrations, since the rotor shipping brace might
not absorb these completely.
Preparations for use
4.13 Transport and storage
LOHER CHEMSTAR 1PS2
Operating Instructions 08/2016
31
Содержание LOHER CHEMSTAR 1PS2
Страница 2: ...04 08 2016 11 45 V3 00 ...
Страница 12: ...Introduction 1 1 About these instructions LOHER CHEMSTAR 1PS2 12 Operating Instructions 08 2016 ...
Страница 38: ...Preparations for use 4 13 Transport and storage LOHER CHEMSTAR 1PS2 38 Operating Instructions 08 2016 ...
Страница 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Страница 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Страница 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Страница 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Страница 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Страница 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Страница 121: ...Quality documents C C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 Operating Instructions 08 2016 121 ...
Страница 122: ...Quality documents C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 122 Operating Instructions 08 2016 ...
Страница 138: ...Quality documents C 2 IECEx certificate LOHER CHEMSTAR 1PS2 138 Operating Instructions 08 2016 ...
Страница 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...
Страница 143: ...AD EC Declaration of Conformity U161 ...
Страница 144: ...Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www siemens com drives ...