As such, you can determine whether the machine needs commissioning or any necessary
measures such as cleaning and/or drying the winding:
● Can the machine be put into operation?
● Must the windings be cleaned or dried?
Detailed information on testing and the limit values can be found here:
"Testing the insulation resistance and polarization index"
7.3
Testing the insulation resistance and polarization index
WARNING
Hazardous voltage at the terminals
During and immediately after measuring the insulation resistance or the polarization index
(PI) of the stator winding, hazardous voltages may be present at some of the terminals.
Contact with these can result in death, serious injury or material damage.
● If any power cables are connected, check to make sure line supply voltage cannot be
delivered.
● Discharge the winding after measurement until the risk is eliminated, e.g. using the
following measures:
– Connect the terminals with the ground potential until the recharge voltage drops to a
non-hazardous level
– Attach the connection cable.
Measure the insulation resistance
1. Before you begin measuring the insulation resistance, please read the operating manual
for the insulation resistance meter you are going to use.
2. Make sure that no power cables are connected.
3. Measure the winding temperature and the insulation resistance of the winding in relation
to the machine enclosure. The winding temperature should not exceed 40° C during the
measurement. Convert the measured insulation resistances in accordance with the formula
to the reference temperature of 40° C. This thereby ensures that the minimum values
specified can be compared.
4. Read out the insulation resistance one minute after applying the measuring voltage.
Start-up
7.3 Testing the insulation resistance and polarization index
LOHER CHEMSTAR 1PS2
Operating Instructions 08/2016
67
Содержание LOHER CHEMSTAR 1PS2
Страница 2: ...04 08 2016 11 45 V3 00 ...
Страница 12: ...Introduction 1 1 About these instructions LOHER CHEMSTAR 1PS2 12 Operating Instructions 08 2016 ...
Страница 38: ...Preparations for use 4 13 Transport and storage LOHER CHEMSTAR 1PS2 38 Operating Instructions 08 2016 ...
Страница 64: ...Electrical connection 6 2 Connecting LOHER CHEMSTAR 1PS2 64 Operating Instructions 08 2016 ...
Страница 74: ...Start up 7 8 Test run LOHER CHEMSTAR 1PS2 74 Operating Instructions 08 2016 ...
Страница 84: ...Operation 8 11 faults LOHER CHEMSTAR 1PS2 84 Operating Instructions 08 2016 ...
Страница 102: ...Maintenance 9 2 Corrective Maintenance LOHER CHEMSTAR 1PS2 102 Operating Instructions 08 2016 ...
Страница 118: ...Service and Support LOHER CHEMSTAR 1PS2 118 Operating Instructions 08 2016 ...
Страница 120: ...Technical data and drawings LOHER CHEMSTAR 1PS2 120 Operating Instructions 08 2016 ...
Страница 121: ...Quality documents C C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 Operating Instructions 08 2016 121 ...
Страница 122: ...Quality documents C 1 EC Declaration of Conformity LOHER CHEMSTAR 1PS2 122 Operating Instructions 08 2016 ...
Страница 138: ...Quality documents C 2 IECEx certificate LOHER CHEMSTAR 1PS2 138 Operating Instructions 08 2016 ...
Страница 142: ...Index LOHER CHEMSTAR 1PS2 142 Operating Instructions 08 2016 ...
Страница 143: ...AD EC Declaration of Conformity U161 ...
Страница 144: ...Siemens AG Process Industries and Drives Postfach 48 48 90026 NÜRNBERG GERMANY www siemens com drives ...