![Siemens FDM225 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/siemens/fdm225/fdm225_technical-manual_380618034.webp)
Mounting / Installation
Preparation
5
34 | 62
Building Technologies
009757_f_en_--
Fire Safety
2016-08-23
Manual call point FDM226
The back box has openings for cable feeds at the top and bottom. When delivered,
the openings are sealed with plastic parts.
The scope of supply for the manual call point FDM226 includes two fastening tabs
and two screws for fitting the fastening tabs.
1. Open the manual call point as shown in the diagram.
– Insert the key into the opening on the bottom of the manual call point.
– Use the key to pull the housing cover forward and off the back box.
2. Remove the plastic parts from the necessary openings for the cable entry.
3. Install the metal cable glands M20 x 1.5 at the openings using metal counter
nuts.
4. NOTICE! Leaky housing! Manual call point damaged and malfunctioning. Do
not drill any holes through the rear wall of the back box! Only use the intended
openings in the back box!
5. On the rear of the back box (1), remove the bars (2) for the two fastening
tabs (3) at the sides.
6. Working from the rear, install the fastening tabs (3) on the rear panel of the
back box (1) using the screws supplied (4), as shown in the diagram.
The manual call point FDM226 is now prepared for mounting.
Figure 12: Opening the manual call point FDM226 with the key
1
2